Laserfiche WebLink
THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br />State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br />OWNER) <br />and Timothy Rose Contracting, Inc. <br />(hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree <br />as follows: <br />ARTICLE 1 -WORK <br />1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br />Documents. The Work is generally described as follows: <br />FM# 446073-1-58-1 includes the construction of a 12 -foot Trail consisting of a <br />coquina base and an asphalt surface. The project further includes some drainage <br />improvements, trail signage and sod. <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for which the Work under the Contract Documents may be the whole or only a <br />part is generally described as follows: <br />Project Name: TRANS -FLORIDA RAILWAY TRAIL FROM FELLSMERE TO <br />WEST OF 1-95 <br />County Project Number: IRC -2115 <br />FM Number: 446073-1-58-01 <br />Bid Number: 2024006 <br />Project Address: 11090 Co Rd 512, Fellsmere, FL 32948 <br />ARTICLE 3 - ENGINEER <br />3.01 The Indian River County Public Works Department is hereinafter called the ENGINEER and <br />will act as OWNER's representative, assume all duties and responsibilities, and have the <br />rights and authority assigned to ENGINEER in the Contract Documents in connection with <br />the completion of the Work in accordance with the Contract Documents. <br />ARTICLE 4 - CONTRACT TIMES <br />4.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br />for final payment as stated in the Contract Documents are of the essence of the Contract. <br />4.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />A. The Work will be substantially completed on or before the 210th calendar day after the date <br />when the Contract Times commence to run as provided in paragraph 2.03 of the General <br />Conditions, and completed and ready for final payment in accordance with paragraph 14.07 <br />Agreement (Public Works) REV 04-07 - 00520 - 2 <br />F:\Purchasing\Bids\2023-2024 FY (2024000)\2024006 Trans -Florida Railway Trail from Fellsmere to West of 1-95\Award documents\IRC-2115_Sample Agreement.d— <br />