Laserfiche WebLink
K. Contractor is registered with and will use the Department of un Security's E -Verify system <br />(www.e-verify.gov) to confirm the employment eligibility of all newly hired employees for the <br />duration of this agreement, as required by Section 448.095, F.S. Contractor is also <br />responsible for obtaining an affidavit from all subcontractors, as required in Section <br />448.095(5)(b), F.S., stating the subcontractor does not employ, contract with, or subcontract <br />with an unauthorized alien. <br />ARTICLE 9 - CONTRACT DOCUMENTS <br />9.01 Contents <br />A. The Contract Documents consist of the following: <br />1. This Agreement (pages 00520-1 to 00520-10, inclusive); <br />2. Notice to Proceed (page 00550-1); <br />3. Public Construction Bond (pages 00610-1 to 00610-3, inclusive); <br />4. Sample Certificate of Liability Insurance (page 00620-1); <br />5. Contractor's Application(s) for Payment (pages to inclusive); <br />6. Certificate of Substantial Completion (pages to , inclusive); <br />7. Contractor's Final Certification of the Work (pages to inclusive); <br />8. General Conditions (pages 00700-1 to 00700-38, inclusive); <br />9. Supplementary Conditions (pages 00800-1 to 00800-13, inclusive); <br />10. Architectural Project Manual Bid Set, prepared by Donadio & Associates, Architects, <br />P.A., A Spiezle Group, Inc., Identified with Project Number 2018.23.004, dted August <br />18, 2023. <br />11. Drawings consisting of a cover sheet (A0.10), and sheets listed in the Index of Drawings, <br />with each sheet bearing the following general title: Jones Pier Historic Residence <br />Museum <br />12. Addenda 1 to 2; <br />13. Appendices to this Agreement (enumerated as follows): <br />Appendix A — Permits <br />14. CONTRACTOR'S BID (pages 00310-1 to 00310-6, inclusive); <br />15. Bid Bond (page 00430-1); <br />16. Sworn Statement Under Section 105.08, Indian River County Code, on Disclosure of <br />Relationships (pages 00452-1 to 00452-2, inclusive); <br />