Laserfiche WebLink
i <br />FORsI 523-01040 <br />CONSTRUCTION <br />01C • 01% <br />AGENCY N ME ' " 1ING resiDUZ <br />• "` �'� <br />STATE Of rl.OamA DErART� TOr Tawvf /OaTATgv <br />o� <br />Indian River County <br />LOCAL AGENCY PROGRAM <br />P.E. ■. Agency Work <br />b. Other <br />c. Department Services <br />d. Total PE Cost Estimate (a+b+c) <br />1840 25th Street <br />AGREEMENT <br />EXHMITy(FI�Tf .B. <br />F.D.O.T. PROJECT NO. <br />Vero Beach, FL 32960 <br />ESTIMATE OF FUNDING <br />1� <br />PROJECT DESCRIPTION <br />Name Roseland Road (CR 505) Bikepath Length 1.0 mile <br />Termini 126th Street to 300 feet west of U.S. Highway #1 <br />Description of Work: <br />TYPE OF WORT: <br />ESTIMATE OF FUNDING <br />(I) <br />ESTIMATED TOTAL <br />PROJECT FUNDS <br />(2) <br />FSTDAATED AGENCY <br />FUNDS <br />(3) <br />ESTIMATED <br />FEDERAL FUNDS <br />P.E. ■. Agency Work <br />b. Other <br />c. Department Services <br />d. Total PE Cost Estimate (a+b+c) <br />16, 0 <br />6, <br />1� <br />16 000 <br />Rlght•of•Way e. Agency Work <br />f.Other <br />g. Department Services <br />h. Total R/W Cost Estimate (e+f+ ) <br />- <br />Concoction i. Contract <br />j. other Ra; l road oGG' nq_ <br />k. Other <br />I. Other <br />m. Toul Contract Cosa (i+j+k+l) <br />Construction Engineering <br />n. Agency <br />o. Other <br />p. Department Forces <br />q. Total Commctton Engineering (n+o+p) <br />r. Total Concoction Cost Estimate (m+q) <br />132.000 <br />132.000 <br />75, nn0 <br />75, 000 <br />207.000 <br />2n7. 000 <br />6, 000 <br />6, 000 <br />6,500 <br />6 000 <br />s. TOTAL COST ESTIMATE OF THE <br />PROJECT (d+h+r) <br />229,000 <br />229, 000 <br />*Federal participation in Construction En ineenne (q) is limited to 15% of the Total Contra Costs. (line in. column 31 <br />The Federal aid participation rate in this project will be determined by the Feder! Government. The parties a oat th _t a -311 w 100., <br />the Agency agrees that this agrecment is entered without relying upon any representation <br />by the Sum rude outside of this contract. or contained herein. as to what the Federal participation rate will be. It further agrees that it will <br />not condition any future actions with respect to the project covered by this agr±e-ment upon Part. current. or fi:mm representations as to the <br />Federal participation rate. The dollar amount of Federal Paruapatton cannot exceed the amount shown to line s.. column (3). All costs <br />not reimbursed by the Federal Government shall be the responsibility of the Agency. <br />Exhibit 11-2-1 1ntal Agency Progrm Agremmt <br />RECYCLED PAPER® <br />2-2-14 <br />