My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-247
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-247
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2023 10:22:51 AM
Creation date
12/19/2023 10:22:03 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
11/07/2023
Control Number
2023-247
Agenda Item Number
8.P.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
Work Order #6 Amendment #1 for Oslo Water Treatment Plant Improvements,
Construction Phase Services
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 Task hour estimate IRC OSLO WiP ELEC EQUIP & PLC REHAB ADDITIONAL SERVICES C&W ENGAir <br />Additional Services Proposal from September 2023 to May 2024 <br />IRC Oslo WTP Improvements for HSPS/Nano Train/Wells and PLC-SCADA Tasks 4 thru 8 CONSTRUCTION SERVICES, task hour estimate <br />Testing and Startups of systems, PLC panels, chemical systems, pumps, VFDs and Instruments <br />Attend monthly progress meetings (total of 8 meetings from Sept 2023 to May 2024) <br />Attend Well 2 PLC/RTU and confirm FO terminations and startup, provide punch list <br />Attend Well 3 PLC/RTU and confirm FO terminations and startup, provide punch list <br />Attend Well 5 PLC/RTU and confirm FO terminations and startup, provide punch list <br />Attend Well 6 PLC/RTU and confirm FO terminations and startup, including Well 6 Soft starter, provide punch list. <br />Attend the Feedwaler and concentrate piping @CTF including Feedwater VFD equipment after its been programmed to operate as VFD no soft starter <br />This shall include the finished water panel startup, check field instruments and signals from HSP 4 and 5 <br />Attend the RO Skid 2 demo and installation progress and attend the startup of the Skid No 2 Status panel and RIO PLC panel <br />and Rs instruments and motorized valves., provide punch list <br />Reviewthat all signals with CP -1 and HSP -PLC control panels have been completed and picked up in SCADA <br />Attend the RO Skid 3 demo and installation progress and attend the startup of the Skid No 3 Status panel and RIO PLC panel <br />and its instruments and motorized valvae., provide punch list <br />Attend the RO Skid 1 demo and installation progress and attend the startup of the Skid No 1 Status panel and RIO PLC panel <br />and its instruments and motorized valves, provide punch list <br />Attend the RO Skid 4 demo and installation progress and attend the startup of the Skid No 4 Status panel and RIO PLC panel <br />and As instruments and motorized valves, provide punch list <br />Mscellanous Walk through plant systems, CO2, bulk storage tank, CIP cleaning systemoride, Acid <br />Provide As -built drawings based on Contractor redlines <br />MAN HOUR TOTALS 5 86 45 6 <br />MAN HOUR RATES <br />ENGINEER $ 180 $ 130 <br />AUTO CAD DRAFTING $ 95 <br />SECRETARIAL $ 45 <br />LABOR COST SUBTOTALS 900 1 11180 1 4275 1 270 <br />LABOR COST TOTAL $ 16.625 <br />Fee <br />1 OF <br />$16,626 <br />
The URL can be used to link to this page
Your browser does not support the video tag.