Laserfiche WebLink
SECTION 00520 Agreement (Public Works) <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br />State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br />OWNER) and Dickerson Infrastructure, Inc., DBA Dickerson Florida, Inc. (hereinafter called <br />CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree <br />as follows: <br />ARTICLE 1 -WORK <br />1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br />Documents. The Work is generally described as follows: <br />The proposed project includes dune renourishment within the County's Sector 3 <br />Project Area via the placement of approximately 274,368 cubic yards of beach - <br />compatible sand fill and the installation of about 728,633 native dune plants over <br />approximately 6.6 miles of Atlantic Ocean beach in central Indian River County. <br />Sand fill is proposed to be obtained from either (a) an upland sand source pre- <br />qualified by the County, and/or (b) an upland sand source separately approved by <br />the Florida Department of Environmental Protection. To avoid adverse impacts to <br />nesting sea turtles, construction is expected to be completed during the period of <br />November 1, 2023 to April 30, 2024. <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for which the Work under the Contract Documents may be the whole or only a <br />part is generally described as follows: <br />Project Name: SECTOR 3 HURRICANES IAN AND NICOLE DUNE <br />RENOURISHMENT PROJECT <br />County Project Number: IRC -2315 <br />Bid Number: Error! Reference source not found. <br />Project Address: SECTOR 3 INDIAN RIVER COUNTY COASTLINE <br />ARTICLE 3 - ENGINEER <br />3.01 The Indian River County Public Works Department is hereinafter called the ENGINEER and <br />will act as OWNER's representative, assume all duties and responsibilities, and have the <br />rights and authority assigned to ENGINEER in the Contract Documents in connection with <br />the completion of the Work in accordance with the Contract Documents. <br />ARTICLE 4 - CONTRACT TIMES <br />4.01 Time of the Essence <br />A. All time limits for Milestones, if any, Final Completion, and completion and readiness for final <br />payment as stated in the Contract Documents are of the essence of the Contract. <br />Agreement (Public Works) REV 04-07 - 00520 - 2 <br />