Laserfiche WebLink
I. CONTRACTOR has given ENGINEER written notice of all conflicts, errors, ambiguities, or <br />discrepancies that CONTRACTOR has discovered in the Contract Documents, and the <br />written resolution thereof by ENGINEER is acceptable to CONTRACTOR. <br />J. The Contract Documents are generally sufficient to indicate and convey understanding of <br />all terms and conditions for performance and furnishing of the Work. <br />K. Contractor is registered with and will use the Department of Homeland Security's E -Verify <br />system (www.e-verify.gov) to confirm the employment eligibility of all newly hired employees <br />for the duration of this agreement, as required by Section 448.095, F.S. Contractor is also <br />responsible for obtaining an affidavit from all subcontractors, as required in Section <br />448.095(5)(b), F.S., stating the subcontractor does not employ, contract with, or subcontract <br />with an unauthorized alien. <br />ARTICLE 9 - CONTRACT DOCUMENTS <br />9.01 Contents <br />A. The Contract Documents consist of the following: <br />1. This Agreement (pages 00520-1 to 00520-10, inclusive); <br />2. Notice to Proceed (page 00550-1); <br />3. Public Construction Bond (pages 00610-1 to 00610-3, inclusive); <br />4. Sample Certificate of Liability Insurance (page 00620-1); <br />5. Contractor's Application for Payment (pages 00622-1 to 00622-6 inclusive); <br />6. Contractor's Final Certification of the Work (pages 00632-1 to 00632-2, inclusive); <br />7. Professional Surveyor & Mapper's Certification as to Elevations and Locations of the <br />Work (page 00634-1): <br />8. General Conditions (pages 00700-1 to 00700-38, inclusive); <br />9. Supplementary Conditions (pages 00800-1 to 00800-12, inclusive); <br />10. Construction Specifications Prepared by Aptim Environmental & Infrastructure, LLC, <br />dated September 12, 2023 <br />11. Drawings consisting of a cover sheet (CS -1) and sheets numbered CD -1 through CD -3, <br />OV -1, PV -1 through PV -24, XS -1 through XS -9, and D-1 through D-2, inclusive, with <br />each sheet bearing the following general title: Sector 3 Hurricanes Ian and Nicole Repair <br />Project Construction Plans; <br />12. Addendum 1; <br />13. CONTRACTOR'S BID (pages 00310-1 to 00310-6, inclusive); <br />14. Bid Bond (page 00430-1): <br />Agreement (Public Works) REV 04-07 - 00520 - 6 <br />