Laserfiche WebLink
SECTION 00520 Agreement (Public Works) <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br />State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br />OWNER) <br />and Proctor Construction Company, LLC <br />(hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree <br />as follows: <br />ARTICLE 1 -WORK <br />1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br />Documents. The Work is generally described as follows: <br />The proposed project includes a single story concrete block structure with a total <br />of 16,617 square feet. The space will be split between office, shop, and warehouse. <br />The roof will be a modified bitumen system on rigid insulation and mechanically <br />attached to a galvanized metal deck on steel bar joists. Two covered parking <br />structures are proposed consisting of metal roof over rigid steel frame. Work to also <br />include demolition of the existing site in two phases, leaving the existing shop until <br />phase 11 to demo. An existing parking area will be modified to create a new <br />entrance%xit. Site utility work is also necessary to complete the project. <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for which the Work under the Contract Documents may be the whole or only a <br />part is generally described as follows: <br />Project Name: TRAFFIC OPERATIONS FACILITY <br />County Project Number: IRC -2104 <br />Bid Number: 2023059 <br />Project Address: 4548 4111 Street, Vero Beach, FL 32967 <br />ARTICLE 3 - ENGINEER <br />3.01 The Indian River County Public Works Department is hereinafter called the ENGINEER and <br />will act as OWNER's representative, assume all duties and responsibilities, and have the <br />rights and authority assigned to ENGINEER in the Contract Documents in connection with <br />the completion of the Work in accordance with the Contract Documents. <br />ARTICLE 4 - CONTRACT TIMES <br />4.01 Time of the Essence <br />Agreement (Public Works) REV 04-07 - 00520 - 2 <br />F:\Purchasing\Bids\2022-2023 FY (2023000(\2023059 Traffic Operations Facility\IRC-2104_Sample Agreement.dou <br />