CHANGE ORDER NO. 1
<br />DESCRIPTION OF ITEMIZED CHANGES
<br />PROJECT NAME: 6th Avenue Milling & Resurfacing
<br />IRC -1638 BID NO. 2022008
<br />,N2 A., .�
<br />110410
<br />�:.-
<br />Deiid•l6. .,.. ., >. ,., .... __' ri% �.. ri`_ ..
<br />REMOVAL OF EXISTING CONCRETE PAVEMENT,REMOVAL OF
<br />EXISTING CONCRETE
<br />;--
<br />SY
<br />r�
<br />44.95
<br />20.20
<br />Bnce-1`r0,,,^::
<br />907.99
<br />337783
<br />ASPHALTIC CONCRETE FRICTION COURSE (TRAFFIC C)
<br />(FC12.5) (PG 76-22
<br />TN
<br />662.76
<br />151.81
<br />100,613.60
<br />5201 10
<br />ICONCRETE CURB & GUTTER, TYPE F
<br />LF 1
<br />7.00
<br />1 17.69
<br />123.83
<br />5222
<br />CONCRETE SIDEWALKS & DRIVEWAYS, 6" THICK, (3,000PSI
<br />FIBERMESH REINFORCED)
<br />SY
<br />476.37
<br />47.62
<br />22,684.74
<br />5272
<br />DETECTABLE WARNINGS
<br />SF
<br />221.50
<br />41.63
<br />9,221.05
<br />630211
<br />CONDUIT, FURNISH & INSTALL, OPEN TRENCH
<br />LF
<br />16.00
<br />7.81
<br />124.96
<br />6331 123
<br />FIBER OPTIC CABLE, F&I, UNDERGROUND, 49-96 FIBERS
<br />LF
<br />840.00
<br />4.16
<br />3,494.40
<br />635211
<br />PULL & SPLICE BOX, F&I, 13" X 24" COVER SIZE
<br />EA
<br />37.00
<br />749.39
<br />27,727.43
<br />635212
<br />PULL & SPLICE BOX, F&I, 24" X 26" COVER SIZE
<br />EA
<br />11.00
<br />1696.53
<br />18,661.83
<br />635213
<br />PULL & SPLICE BOX, F&I, 30" X 60" COVER SIZE
<br />EA
<br />3.00
<br />4738.82
<br />14,216.46
<br />7061 1
<br />RAISED PAVEMENT MARKER, TYPE B, WITHOUT FINAL
<br />SURFACE MARKINGS
<br />EA
<br />88.00
<br />3.64
<br />320.32
<br />71111123
<br />THERMOPLASTIC, STANDARD, WHITE, SOLID, 12" FOR
<br />CROSSWALK AND ROUNDABOUT
<br />LF
<br />467.00
<br />3.02
<br />1,410.34
<br />711 11125
<br />THERMOPLASTIC, STANDARD, WHITE, SOLID, 24" FOR STOP
<br />LINES AND CROSSWALK
<br />LF
<br />51.00
<br />6.04
<br />308.04
<br />711 16201
<br />THERMOPLASTIC, STANDARD -OTHER SURFACES, YELLOW,
<br />SOLID, 6"
<br />GM
<br />0.239
<br />4126.83
<br />986.31
<br />1080 21108
<br />UTILITY FITURE, VALVE BOX, FURNISH & INSTALL, 8"
<br />EA
<br />12.00
<br />884.69
<br />10,616.28
<br />327 70 6
<br />MILLING EXISTING ASPHALT PAVEMENT 1-1/2" AVG DEPTH
<br />SY
<br />1557.00
<br />3.41
<br />5,309.37
<br />4256
<br />VALVE BOXES, ADJUST
<br />EA
<br />7.00
<br />624.49
<br />4,371.43
<br />5701 2
<br />PERFORMANCE TURF, SOD
<br />SY
<br />3905.00
<br />3.12
<br />12,183.60
<br />711 11170
<br />THERMOPLASTIC, STANDARD, WHITE, ARROWS
<br />EA
<br />9.00
<br />57.24
<br />515.16
<br />711 16101
<br />THERMOPLASTIC, STANDARD -OTHER SURFACES, WHITE,
<br />SOLID, 6"
<br />GM
<br />0.01
<br />4126.83
<br />41.27
<br />71116131
<br />THERMOPLASTIC, OTHER SURFACES, WHITE, SKIP, 6", 10-30
<br />SKIP
<br />GM
<br />0.013
<br />1032.36
<br />13.42
<br />711 16231
<br />THERMOPLASTIC, STANDARD -OTHER SURFACES, YELLOW,
<br />SKIP, 6"
<br />GM
<br />0.026
<br />1032.45
<br />26.84
<br />WCD#1
<br />DRAINAGE WORK 6906TH AVENUE
<br />LS
<br />1.00
<br />98172.26
<br />98,172.26
<br />WCD#2
<br />DRAINAGE WORK 1610 TO 16406TH AVENUE
<br />LS
<br />1.00
<br />97028.44
<br />97,028.44
<br />999-25
<br />FORCE ACCOUNT
<br />LS
<br />1.00
<br />180,000.00
<br />180,000.00
<br />SUBTOTALS
<br />217,661.79
<br />391,417.57
<br />6th Avenue Milling & Resurfacing TOTAL
<br />($173,755.78)
<br />
|