My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/21/2023
CBCC
>
Meetings
>
2020's
>
2023
>
11/21/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 9:29:50 AM
Creation date
1/4/2024 10:08:45 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
11/21/2023
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I1. Scope of Work- Basic Services <br />a. Phase I— kick off design charette/programmin g: (Part of Phase I was included in <br />the RFQvesponse to RFQ 2021020) <br />i. Dick off charette - sparcdesign will schedule a Wie-day working session with <br />the design committee and staff to kick off the (easter plan process. This will <br />include a round table discussion to review# current planning ideas on <br />the different facilities to be studied, interviewing appropriate staff, <br />photographing, and doing some preliminary overlay sketches and <br />concepts distilled from the meetings: Other goals will be % begin <br />developing programmatic requirements for each of the facilities to be <br />studied. We will also discuss overall project goals and outline a project <br />schedule. We will discuss delivery methods and materials the county <br />requires for presenting to the Sandridge Design Committee. <br />b. Phase II - Programming and masterplan solutions (Part of Phase li was included in <br />the RFQ response to RFQ 2021020) <br />i. Programming - Following the team's initial kick off, sparcdesign will create <br />a running meeting agenda and begin to formalize the project schedule <br />and program requirements for each facility. Refined programming for <br />each project will include the following <br />1. Identify each project/facility type and gather relevant <br />programmatic information for each existing space . <br />2. Establish goals and objectives specific to each project type/space <br />3. Discuss Strategies for implementing goals and objectives based on <br />strategic planning master plan sketches. <br />4. Discuss overall project budget <br />5. Program Document summarizing information gathered from Phase <br />1-2. <br />ii. Master Plan solutions- Once the program for the master plan is developed <br />sparcdesign will proceed with developing refined master plan sketch <br />solutions. We will study to the existing site plan and develop solutions to <br />integrate the master plan program. This will include studies on how the <br />proposed facilities will impact the existing property. A site analysis of the <br />different opportunities and constraints available. A parking analysis will also <br />be, included studying the current and future parking counts affected by the <br />master plan study. During this phase we will translate the program <br />requirements for the facility improvements into conceptual floor plans ,> <br />inform the building sizes and went onsite. We will include up to fl) <br />options for the site and floor plan studies in the base fee. During this phase <br />we will also utilize concept photos of similar types of projects to help <br />summarize the club's goals in a visual manner. <br />
The URL can be used to link to this page
Your browser does not support the video tag.