My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/21/2023
CBCC
>
Meetings
>
2020's
>
2023
>
11/21/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 9:29:50 AM
Creation date
1/4/2024 10:08:45 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
11/21/2023
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
August 8,2022 <br />The Owner: <br />Bela Nagy, Director of Golf, PGA <br />c/o Indian River County Purchasing Division <br />1800 27", Street <br />Vero Beach, Florida 32960 <br />The Architect: <br />Sun Patrick Architecture, Inc. <br />DBA: sparcdesign <br />3021 Jupiter Park Circle, Suite 102 <br />Jupiter, FL 33458 <br />RE: Sandridge Golf Club New Clubhouse <br />sparcdesign project 2021.159 <br />Additional Service #2, Additional Civil Engineering Services <br />Dear Mr. Nagy: <br />We are submitting this additional service request for additional scope of work to complete the Civil Engineering Design for <br />the New Clubhouse. The additional scope of work arose as a result of coordination with County Engineering for <br />requirements to Sprinkler the new clubhouse. It was discovered that the existing domestic water supply feeding the site <br />was insufficient size to meet the county requirements to serve the building's domestic water supply and the Sprinkler system. <br />As a result, a new water supply service will need to be designed leading from the main supply on 58th avenue to the site. <br />The tasks are outlined below for the design of the new system. <br />Task F: Potable Water Extension Main Design <br />Task G: Permitting <br />Task H: Responses to Request for Additional Information <br />We propose to perform this work as an additional service utilizing the terms outlined in the Agreement for Professional <br />Services for Sandridge Clubhouse Architectural Design Services - RFQ2021020-Master Plan Study Phase dated October 1, <br />2021. We propose to perform Task 'F' and 'G' work for a fixed fee of eleven thousand two hundred twenty dollars ($11,220). <br />We propose to perform Task 'H' work for a "Not to Exceed" fee of six thousand six hundred dollars ($6,600). <br />Feel free to contact me with any comments or questions you have. Acceptance of this proposal may be indicated by <br />signing, dating, and returning (1) copy of this letter. <br />APPROVED AS TO <br />Sincerely, AND LEGAL 81- <br />San khu,Partner <br />.•'pv�t •Miss . �`!,A" <br />Attest: Jeffrey R. Smith, Clerk of <br />Circuit Court and Comptroller <br />Client Signature and date ` F* 4a4 <br />Peter D. O'Bryan, Chairman <br />Printed name and Tirle ` �;v �Q: • Deputy CIO* <br />
The URL can be used to link to this page
Your browser does not support the video tag.