My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/21/2023
CBCC
>
Meetings
>
2020's
>
2023
>
11/21/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 9:29:50 AM
Creation date
1/4/2024 10:08:45 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
11/21/2023
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LF,m <br />pares <br />law <br />Description Qty <br />Re -using: <br />. . . . . . . . . . <br />7 x PACU (2018) <br />Professional Services <br />lalfiks="i tion <br />SV-InstDaily <br />Installation Services - Daily Rate <br />$1,300.00 <br />5 <br />SV-InstRemDaily <br />Remote Install Services - Daily Rate <br />S1,300.0$ <br />2 <br />SV-T&LlstD <br />Travel and Living Expenses - First Day <br />$1,700.00 <br />1 <br />SV-T&LSubD <br />Travel and Living Expenses - Daily <br />$14,475.00 <br />SV-SOLAPS Remote Solacom System Engineering I Day $1,620.00 <br />SV-ServerSetup <br />Server Configuration Update <br />$900-00 <br />11 <br />Import existing Database and tune existing configuration for <br />usability with newer servers and Operating system. Load updated <br />config onto new servers. <br />SV-PositionSetup Position Configuration Update <br />Tune existing PC configuration and import fonIXONYWO Ne"r <br />PC andOperating system. Load updated cor*g, onto <br />SV-SiteAudit System Refresh Audit $4 000.0C <br />System technical audit: <br />- Audit coordination <br />- Assess system design, connectivity, user interface usage, call <br />flow and site conditions <br />- Review system changes from original to determine changes <br />required for new updated configuration manual <br />- Review, determine and produce system upgrade plan based on <br />current configuration <br />$6,500.00 <br />$2,1600.00 <br />$1,700.00 <br />$1,11320.00 <br />$9,900.00 <br />SV-PSUpgracle Professional Services Refresh $12,900;01111' <br />1 <br />$12,900.00 <br />Ensure accurate hardware requirements <br />Assess database requirements and provide guidance <br />Assist with management of -upgrade requirements <br />SV-PMDaySd Secondary Project Management -Daily Rate $965.00 <br />15 <br />$14,475.00 <br />SV-SOLAPS Remote Solacom System Engineering I Day $1,620.00 <br />8 <br />$12,960.00 <br />SV -SBC Setup SBC config & setup for I Network $1,300.00 <br />4 <br />I <br />$5,200.00 <br />Subtotal: <br />W to 001199 v7 <br />$89,855.00 <br />63 <br />W <br />Page: 10 of 14,P, <br />
The URL can be used to link to this page
Your browser does not support the video tag.