Laserfiche WebLink
CHANGE ORDER NO. 1 <br />DESCRIPTION OF ITEMIZED CHANGES <br />69th Street 66th Avenue to US -1 Resurfacing (SCOP) <br />PROJECT NO. IRC -1639 BID NO. 2022028 FM NO. 438073-1-54-01 <br />Item No. '' Descri <br />tion = <br />Unit <br />Quant( <br />Unit Price <br />Frice Increase <br />Prlce Decrease' <br />337-7-82 <br />ASPHALTIC CONCRETE FRICTION COURSE (FC -9.5) (TRAFFIC <br />C) (1" <br />TN <br />61 <br />179.55 <br />10 963.32 <br />570-1-1 <br />PERFORMANCE TURF SOD BAHIA <br />SY <br />2.85 <br />8,200.00 <br />23 616.00 <br />WCD-1 <br />ADDT PIPE INSTALLATION - NON PART FDOT <br />LS <br />1 <br />30 749.50 <br />30 749.50 <br />WCD-2 110-7- <br />1 <br />MAILBOX F&I - FDOT NON -PARTICIPATING <br />EA <br />1 <br />141.00 <br />141.00 <br />WCD-2 283-1 <br />ASPHALT EMULSION TYPE CSS -1H - FDOT NON- <br />PARTICIPATING FDOT <br />NON -PARTICIPATING <br />GA <br />10,000 <br />3.65 <br />36 500.00 <br />WCD-2 283-7 <br />FULL DEPTH RECLAMATION - FDOT NON -PARTICIPATING <br />SY <br />12,072 <br />8.85 <br />106 837.20 <br />WCD-2 285- <br />706 <br />OPTIONAL BASE GROUP 04 - FDOT NON -PARTICIPATING <br />SY <br />9 <br />9.00 <br />81.00 <br />WCD-2 285- <br />716 <br />OPTIONAL BASE GROUP 18- FDOT NON -PARTICIPATING <br />SY <br />23 <br />38.50 <br />685.50 <br />WCD-2 334-1- <br />13A <br />SUPERPAVE ASPHALT (SP -12.5 1.5") - FDOT NON - <br />PARTICIPATING <br />TN <br />2 <br />139.91 <br />279.82 <br />WCD-2 334-1- <br />13B <br />SUPERPAVE ASPHALT (SP -12.5,2.0") - FDOT NON - <br />PARTICIPATING <br />TN <br />1 <br />557.81 <br />557.81 <br />WCD-2 430- <br />175- <br />118A <br />CONCRETE PIPE CULVERT 18" - FDOT NON -PARTICIPATING <br />LF <br />53 <br />99.00 <br />5,247.00 <br />WCD-2 430- <br />984- <br />125 <br />MITERED END SECTION (ROUND 18") - FOOT NON - <br />PARTICIPATING <br />EA <br />2 <br />3,558.00 <br />7,116.00 <br />WCD-2 570-1-1 <br />PERFORMANCE TURF (SOD, BAHIA) - FDOT NOW <br />PARTICIPATING <br />SY <br />53 <br />2.88 <br />152.64 <br />WCD-3 <br />F&I TYPE F CURB AND GUTTER (HAND FORMED), F&112 -INCH <br />CONCRETE COLLAR <br />LS <br />1 <br />18 497.60 <br />18 497.60 <br />WCD-4 <br />CLEAR, GRADE & SOD EMBANKMENT AREA ADJACENT TO <br />PROPOSED CURB SHOULDER EB LANE OF 69TH ST <br />LS <br />1 <br />11 290.16 <br />11 290.16 <br />WCD-6 <br />GRADE AND SOD APPROX 110 LINEAR FT OF SWALE AND MOD <br />TO DRAINAGE APRON & STRUCTURE <br />LS <br />1 <br />6,166.71 <br />6J66.71 <br />285-716 <br />OPTIONAL BASE GROUP 18 CEMENTED COQUINA LBR 100 16" <br />SY <br />529 <br />38.50 <br />20 366.50 <br />334-1-13A <br />SUPERPAVE ASPHALT CONCRETE SP -12.5 TRAFFIC C 1.5" <br />TN <br />149 <br />139.91 <br />20 859.18 <br />522-2 <br />CONCRETE SIDEWALK AND DRIVEWAYS 6" THICK FIBER REIN <br />SY <br />56.00 <br />52.50 <br />2,940.00 <br />1060-11-222A <br />UTILITY STRUCTURE AND MANHOLE - BELOW GROUND W/ <br />ARV <80 CF 9.1'-12' <br />EA <br />0.23 <br />6,847.00 <br />1,574.81 <br />999-25 <br />FORCE ACCOUNT - ROADWAY <br />LS <br />1 <br />350 000.00 <br />350 000.00 <br />999-25A <br />FORCE ACCOUNT - UTILITIES <br />LS <br />1 <br />80 000.0080 <br />000.00 <br />SUBTOTALS <br />259,081.26 <br />�4750.49 <br />69th Street 66th Avenue to US -1 Resurfacing (SCOP) TOTAL <br />$ (216,659.23) <br />1 <br />PkPobic WerkskENGINEERING DIVISION PROJECTSi1639 69th Street 66th Avenue to USA Reswfwlrg I,SCOPAI-AdrrdM pends Ibm T,o;,ecl CloseouNRC-1639_COI_20231121 <br />