Laserfiche WebLink
A TRUE COPY <br />CERTIFICATION ON LAST PAGE <br />PYAN L. BUTLER, CLERK <br />d) For Derelict Vessels Sunken in Shallow Water: <br />a) Install and inflate flotation bags as needed. <br />b) Lift the vessel with barge mounted crane or similar equipment. <br />A pre -construction meeting will be held between the County and the Contractor prior to the implantation <br />of the removal process. <br />FWC/DV-APP (Feb 2020) 5 Rule 68-1.003 <br />