My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-260
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-260
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2024 10:41:59 AM
Creation date
1/4/2024 10:41:05 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Application
Approved Date
12/05/2023
Control Number
2023-260
Agenda Item Number
8.I.
Entity Name
Florida Fish and Wildlife Conservation Commission
Subject
Derelict Vessel Grant Application for Removal of Vessel
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A TRUE COPY <br />CERTIFICATION ON LAST PAGE <br />nYAN L. CUTLER, CLERK <br />IV. PROJECTED OUTCOMES <br />a. How many total derelict vessels are there in the project's jurisdiction? What percentage of the total derelict <br />vessels located within the project's jurisdiction will be removed by this project? (Limited to those listed in <br />the Statewide Derelict Vessel Database). <br />There are currently fourteen open derelict vessel cases in Indian River County. There are currently <br />four derelict vessels authorized for removal. Indian River County intends to remove 29% of the <br />open vessels cases, 100% of the authorized derelict vessels within the County. <br />Describe the system to be used in demonstrating complete removal and destruction of the removed vessel(s). <br />Include the procedure to verify contractor's completeness in removal of the vessel(s). <br />A marine barge and crane will be used to lift and remove derelict vessels from the waters of the <br />Indian River Lagoon. FWC Removal Guidelines will be followed to prevent impacts to the waters <br />and surrounding area. The barge will transport removed vessels to the boat ramp for removal where <br />they will be disposed of at an authorized landfill. Coastal Engineering staff will observe the removal <br />process, documenting removal and disposal, including the inclusion of photos and landfill tickets in <br />the final report. Upon completion of the removal, Coastal Engineering staff will inspect the location <br />to insure all debris has been removed. FWC Law Enforcement will be notified prior to removal and <br />upon removal completion with documentation. <br />V. BUDGET <br />Has a detailed cost estimate/proposal been developed for this derelict vessel removal project? If yes, attach a copy of <br />application. <br />❑✓ YES ❑ NO <br />VI. OTHER SOURCE OF FUNDS (STATUS) <br />a. ❑ Federal ❑ State/Local ❑ Loan Agency: <br />b. Grant Name: Amount: <br />c. Approval Status: ❑ Approved ❑ Pending Intend to Apply, Date: <br />FWC/DV-APP (Feb 2020) 8 Rule 68-1.003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.