My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-261
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-261
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2024 11:00:30 AM
Creation date
1/4/2024 10:59:06 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
12/05/2023
Control Number
2023-261
Agenda Item Number
8.L.
Entity Name
GRSC, Inc.
Subject
Section 00520 Agreement for Sporting Clays Facility Improvements,
Project Number
IRC-1847
Bid Number
2024016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00520 Agreement (Public Works) <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br />State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br />OWNER) <br />and GRSC, Inc. <br />(hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree <br />as follows: <br />ARTICLE 1 -WORK <br />1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br />Documents. The Work is generally described as follows: <br />The proposed project <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for which the Work under the Contract Documents may be the whole or only a <br />part is generally described as follows: <br />Project Name: SPORTING CLAYS FACILITY IMPROVEMENTS <br />County Project Number: IRC -1847 <br />Bid Number: 2024016 <br />Project Address: 10455102 n' Terrace Sebastian. FL 32958 <br />ARTICLE 3 - ENGINEER <br />3.01 The Indian River County Public Works Department is hereinafter called the ENGINEER and <br />will act as OWNER's representative, assume all duties and responsibilities, and have the <br />rights and authority assigned to ENGINEER in the Contract Documents in connection with <br />the completion of the Work in accordance with the Contract Documents. <br />ARTICLE 4 - CONTRACT TIMES <br />4.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br />for final payment as stated in the Contract Documents are of the essence of the Contract. <br />4.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />A. The Work will be substantially completed on or before the 90th calendar day after the date <br />when the Contract Times commence to run as provided in paragraph 2.03 of the General <br />Conditions, and completed and ready for final payment in accordance with paragraph 14.07 <br />of the General Conditions on or before the 120th calendar day after the date when the <br />Contract Times commence to run. <br />
The URL can be used to link to this page
Your browser does not support the video tag.