My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-261
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-261
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2024 11:00:30 AM
Creation date
1/4/2024 10:59:06 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
12/05/2023
Control Number
2023-261
Agenda Item Number
8.L.
Entity Name
GRSC, Inc.
Subject
Section 00520 Agreement for Sporting Clays Facility Improvements,
Project Number
IRC-1847
Bid Number
2024016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
K. Contractor is registered with and will use the Department of un Security's E -Verify system <br />(www.e-verify.gov) to confirm the employment eligibility of all newly hired employees for the <br />duration of this agreement, as required by Section 448.095, F.S. Contractor is also <br />responsible for obtaining an affidavit from all subcontractors, as required in Section <br />448.095(5)(b), F.S., stating the subcontractor does not employ, contract with, or subcontract <br />with an unauthorized alien. <br />ARTICLE 9 - CONTRACT DOCUMENTS <br />9.01 Contents <br />A. The Contract Documents consist of the following: <br />1. This Agreement (pages 00520-1 to 00520-9, inclusive); <br />2. Notice to Proceed (page 00550-1); <br />3. Public Construction Bond (pages 00610-1 to 00610-3, inclusive); <br />4. Sample Certificate of Liability Insurance (page 00620-1); <br />5. Contractor's Application for Payment (pages 00622-1 to 00622-6 inclusive); <br />6. Certificate of Substantial Completion (pages 00630-1 to 00630-2, inclusive); <br />7. Contractor's Final Certification of the Work (pages 00632-1 to 00632-2, inclusive); <br />8. Professional Surveyor & Mapper's Certification as to Elevations and Locations of the <br />Work (page 00634-1); <br />9. General Conditions (pages 00700-1 to 00700-37, inclusive); <br />10. Supplementary Conditions (pages 00800-1 to 00800-12, inclusive); <br />11. Specifications as listed in Division 1 (General Requirements) and Division 2 (Technical <br />Provisions); <br />12. Drawings consisting of a cover sheet (1 of 7), and sheets numbered 2 through 7 of 7, <br />inclusive, with each sheet bearing the following general title: SPORTING CLAYS <br />FACILITY IMPROVEMENTS <br />13. Addenda (if applicable 1-2); <br />14. Appendices to this Agreement (enumerated as follows): <br />Appendix A — Permits <br />Appendix B — Indian River County Fertilizer Ordinances <br />Appendix C — Indian River County Traffic Engineering Division Special Conditions for <br />Right -of -Way Construction. <br />
The URL can be used to link to this page
Your browser does not support the video tag.