My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-266
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-266
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2024 12:10:55 PM
Creation date
1/4/2024 12:08:18 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
12/12/2023
Control Number
2023-266
Agenda Item Number
8.O.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
Work Order No. 6 for Service related to Gifford Elevated Storage tank Rehabilitation
and Structural Upgrades; RFQ 2023015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE <br />Consultant will complete these tasks in a timely manner and mutually agreed upon <br />schedule. The following schedule for each task is estimated below. Actual schedule may <br />vary based on coordination with the client. <br />Task 1: <br />2 weeks following NTP <br />Task 2: <br />2 — 3 weeks following Task 1 <br />Task 3: <br />2 — 3 weeks (in conjunction with Task 2) <br />Task 4: <br />1-2 Months <br />Task 5: <br />4 Months <br />Total: <br />6 - 8 Months <br />FEESCHEDULE <br />We will provide these services in accordance with the Continuing Contract Agreement <br />for Consulting Engineering Services #2023015 dated May 2nd, 2023, by and between <br />INDIAN RIVER COUNTY, a political subdivision of the State of Florida <br />("COUNTY") and Kimley-Horn and Associates, Inc., ("Consultant"). <br />The Consultant will provide professional services for a lump sum fee as follows: <br />Task 1: Structural Analysis Report <br />$ 8,703 <br />Task 2: Structural Analysis Report w/ Modifications <br />$ 6,569 <br />Task 3: Modification Design Drawings <br />$ 12,803 <br />Task 4: Bidding Assistance <br />$ 6,977 <br />Task 5: Construction Phase Assistance <br />$30,344 <br />Total Tasks 1-5: <br />$ 65,396 <br />ADDITIONAL SERVICES <br />The following services can be provided as additional services under separate future task <br />order: <br />• Carrier Mount Analysis Reports <br />• Corral Design Drawings <br />• Geotechnical Investigations <br />• Foundation Investigations <br />INFORMATION PROVIDED BY OWNER <br />• Record drawings <br />• Existing telecommunication equipment information <br />• Site access information <br />K:\WPB_Civi]\GeneraMing\Marketing\IRCDUS\Gifford Water Tank\2023.11.27 - Gifford Water Tank Modification - Scope <br />(MRD Edits).doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.