Laserfiche WebLink
Task 14.0 Recommendation Summary and Detailed Implementation Plan and <br />Schedule <br />From the prior tasks G&R will prepare a summary of these tasks analysis and <br />recommendations. It will specifically provide the detailed CIP for 20 years for the <br />recommended changes to the system. Each prior task area will be discussed along with <br />the specific recommendation. Technical memorandum will be converted into sections of <br />the overall master pian update. <br />This summary will be in the format of an executive summary report to be added to the <br />"Task 15 Master Plan document. This report will be presented to the County for review. <br />After receipt of comments from the County, G&R will proceed with preparation of the <br />final report. <br />Task 15,0 Retiort Preparation <br />G&R will prepare a draft complete Master plan report which will include the Task lel <br />Master Plan summary along with final versions of the prior subtasks technical <br />memorandums. This report will be presented to the County and discussed at a meeting <br />with the County staff. After receiving comments G&17 will finalize the report <br />Task 16.0 Meetings <br />In addition to the meetings detailed within the tasks of the Scope of Services, G&R <br />anticipates the following additional meetings to discuss project status and the final <br />recommendations: <br />• Two meeting (2) with tite utility Advisory Committee <br />• fwo meetings (2) to the Board of County Commissioners <br />At the above meetings it is anticipated that G&R project team members will present the <br />bulk of the presentation including supplying PowerPoint slides and booklets outlining the <br />discussion. <br />Task 17.0 Additional Services <br />As this project is highly complex with interrelated tasks, additional work beyond the <br />Scope presented herein may be required to complete tite Master Plan or subsequent <br />implementation/analysis of certain aspects of the study. Therefore, the County may <br />request G&R provide additional services related to tate Master Plan. No fees are provided <br />for this Task as it is assumed that any such authorization will be by change order to this <br />contract. <br />15 <br />