My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-269
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-269
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2024 1:28:30 PM
Creation date
1/9/2024 1:26:05 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/19/1999
Control Number
1999-269
Entity Name
Glace & Radcliffe, Inc.
Subject
Contact and Revised Proposal for Solid Waste Master Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(1) Engineering hours at 25% <br />(2) Technician hours at 75% <br />(3) Clerical at 50°x6 <br />(4) Twenty trips to Vero Beach (220 Miles each trip @ $.291mi) <br />(5) No Car Rental <br />(6) Lunch for twrr people each day for twenty trips <br />(7) Binders -60 at $5 each <br />TABLE 3 <br />SUMMARY OF OTHER DIRECT COSTS <br />Engineering Services for Solid Waste Master Plan <br />Total <br />Description <br />Quantity Units Unit Cost <br />Total Cost <br />Reproduction <br />Photocopies <br />10000 cath <br />$0.05 <br />$500 <br />Blueprints <br />0 each <br />$1.00 <br />$0 <br />112 -size Computer Plots <br />100 each <br />$2.25 <br />$225 <br />Full-size Computer Pints <br />0 each <br />$16.00 <br />$0 <br />Color Copies <br />200 each <br />51.00 <br />$200 <br />Full-size Mylar Plots <br />0 each <br />$200 <br />$0 <br />Subtotal - Reproduction <br />$925 <br />Computer Services <br />Engineering(1) <br />428.75 hours <br />$8.20 <br />$3,516 <br />Computer Aided Design(2) <br />187.5 <br />$14.00 <br />'$2,625 <br />Document Processing(3) <br />125 <br />$15.80 <br />$1,975 <br />Subtotal - Computer Services <br />58,116 <br />Travel <br />Mileage(4) <br />4440 Miles <br />$0.29 <br />$1,288 <br />Car Renlal(5) <br />0 days <br />$35.00 <br />s0 <br />Meals(6) <br />20 days <br />$12.00 <br />$240 <br />Subtotal Travel <br />$1,528 <br />Communications (Fax) <br />$300 <br />Postage, Freight, Courier <br />$250 <br />Miscellaneous Supplies (Binders)(7) <br />$300 <br />T0TA1. <br />$11,418 <br />(1) Engineering hours at 25% <br />(2) Technician hours at 75% <br />(3) Clerical at 50°x6 <br />(4) Twenty trips to Vero Beach (220 Miles each trip @ $.291mi) <br />(5) No Car Rental <br />(6) Lunch for twrr people each day for twenty trips <br />(7) Binders -60 at $5 each <br />
The URL can be used to link to this page
Your browser does not support the video tag.