My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-269
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-269
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2024 1:28:30 PM
Creation date
1/9/2024 1:26:05 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/19/1999
Control Number
1999-269
Entity Name
Glace & Radcliffe, Inc.
Subject
Contact and Revised Proposal for Solid Waste Master Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CL] <br />APR -29-1999 tU as RRDAMAN & nSSDC. <br />Glace & RadCJiffe, Inc. <br />File Numbe"rg"l -2 <br />Data collected rofal the field exploration and laboratory testing programs will be presented in a <br />da <br />geoteniA re aloCa9 with our prelirninary evaluation of ft s,ubsurfarc a conditlonsin itre lar4f l <br />expansion are induding the two fonmer wetland areas. Soil baring logs will be prepared and <br />included In thelgeotachnlcal repoft. <br />The costs forcatiirfield, laboratory and enginear€ng services for the above-mantiono d scope of a+►W* <br />are estimated to be is ,800. $3.806 and $5,780, respectively. Accordingly, the total estirrtiated <br />project oast is 5�15.1C1U: This amount will not be excUedod without your rxior approval. Invoices <br />for this pru*i rnA be issued monthly based on the actual mn4wors or crww-hours trended, <br />quantities of mx*riel utilized, and number of laLoratory tosta perfomaed in vocondence wtth itle <br />attached 1990 itre schadule. All outside services wilt be bjW at Coil plus 12%. <br />Our astimatod costs In this proposal assume thea the landfill expansion area, irtdudirag the two <br />former weliand heats. sire aooessible by our drilling equipment. Aliso, the cost estimate provided <br />herein isbased�rr the assumptionthatthesubsurfacecondirionswithinthetandfillexpansionarea <br />are relativelyunifefan_ Additional SPT borings, undisturbed samples and laboratory teets maybe <br />neoessary if thar`*acre signlficantvarialions in subsurface conditions between adjacent soil borings. <br />m <br />Ardean will notify glace a Radcliffe If such conditions are encountered in the fieki. No survey <br />worts I3 In 64ad, in our tsudgel. <br />Ardaman appreciates the opportunity of submitting this proposal for your Consideration. If (his <br />propoe a'il is ait4Ttable Itp you, please have an authorized representative of Glace & Radcliff© sign <br />Moth copses Ile encs seal Proposal Acx eptance Form and return one copy for our record, if you <br />have any queavons or need additional infrormation, please contact us. <br />Vice President . <br />Enclosures <br />
The URL can be used to link to this page
Your browser does not support the video tag.