Laserfiche WebLink
0 <br />04/29/99 THU 08.36 FAX 813 248 8093 RALC011 PIRHIE INC. <br />Task 2.0 Evaluate the Technical Feasibility of a Proposed Ocean Spray Incinerator to <br />Accept And Process Certain Types Of County Waste <br />Yltc objective of this task is to review the technical Wets arxt design criteria of the proposed. Qct an <br />Spray Incinerator and determine the feasibility of this facility accepting and processing certain wa ite <br />types generated by the County. To accomplish this Malcolm Pirnic will; <br />- Review available technical and design information on the proposed incinctator uxludin �: <br />an overview of "chute to stack" mechanics; <br />- preprocessing; requirements; <br />- performance specifications; <br />mass and energy balance; <br />anticipated fuels and charging prapernies; <br />- assumed chemical qualities of residue (with and without County waste); a 1d <br />- permit rcquiremments and limitations on types and quantities of waste. <br />Task 3.0 Attend Meetings and Conduct Site Visits (a combination of 4 meetings/site <br />%isits has beco assumed in preparing our priced proposal), <br />Appropriate Malcolm Pimie staff will be present at and/or conduct up to 4 meetings and site visi s. <br />'Vdc have assumed that site visits will be scheduled either prior to or after meetings to reduce t 1c <br />level ofeffort associated with thus task. <br />PRICED PROPOSAL <br />The following; table presenis our not -to -exceed budget estimate for completing the scope of wo -k <br />as described above. <br />Not -to -)Exceed Budget Estimate <br />Took <br />Description <br />Total Twat <br />Proi►ct <br />projerR <br />Erol. EnpJ <br />Adrnlnl <br />Principal <br />Manapor <br />5rJenVat! <br />Tachnina <br />Hours ❑all.arrs <br />Proresalwal <br />Support <br />1 <br />WrE capitei and Operating <br />4 <br />16 <br />2$ <br />8 <br />56 $6,001 <br />Cost Estimate <br />2 <br />TecnnicolAssessnrenln} <br />7. <br />20 <br />18 <br />3 <br />43 $5,01 <br />Deean Spray Incinerator <br />3 <br />Meetlnys aM SLta VLr is2 <br />iG <br />16 <br />3 <br />37 $4.26 <br />TOTAL LABOR ItOuRs: <br />f; <br />52 <br />62 <br />14 <br />138 <br />HILLtNO)ZATIE $165 $140 $95 545 <br />TOTAL LABOR is) 71.460 $7.280 35,aw 5630 <br />$13,2111 <br />Expenses S98 <br />�YBr21 Not- t0-EXCeedAmounr E16,28t <br />0004 <br />