My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-278
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-278
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2024 2:01:57 PM
Creation date
1/9/2024 2:01:51 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
11/02/1999
Control Number
1999-278
Subject
Amendment 1 Professional Engineering Services Agreement
66th Avenue Paving & Drainage Improvements SR 60 to 4th St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Y <br />49 - <br />AMENDMENT NO. 1 TO THE PROFESSIONAL <br />ENGINEERING SERVICES AGREEMENT <br />66T° AVENUE PAVING AND DRAINAGE IMPROVEMENTS <br />BETWEEN SR 60 TO 4th STREET <br />IRC PROJECT NO. 9810 <br />THIS is an amendment to the existing AGREEMENT dated November 17, 1998, between <br />CARTER ASSOCIATES, INC. (ENGINEER) and INDIAN RIVER COUNTY (COUNTY). <br />This amendment address changes in "SECTION I - PROJECT LIMITS", "SECTION III - <br />SCOPE OF SERVICES" and "SECTION V - COMPENSATION', of the AGREEMENT. <br />PROJECT LIMITS <br />The section of the AGREEMENT entitled "SECTION I - PROJECT LIMITS" shall be <br />revised to include a portion of 66" Avenue approximately 800 feet north of SR 60, and also a <br />portion of 66'' Avenue from ITh Street to 4' Street. The added limits shall also include all side <br />streets connecting to 66' Avenue within 1,200 feet of 66' Avenue including 8' Street and 41 <br />Street. <br />SCOPE OF SERVICES <br />The section of the AGREEMENT entitled "SECTION Ill - SCOPE OF SERVICES" shall <br />be revised to include the additional professional services as follows: <br />ENGINEER, through its subcontractor, Jenkins & Charland, Inc. will prepare preliminary <br />and final bridge/structural plans for the bridge over the Main Relief Canal. Bridge plan submittals <br />will be made at 30%, 90% and 100% stages. The bridge consists of a three -lane bridge with <br />shoulders and sidewalks on both sides expandable to five lanes at a later date. The bridge will be <br />skew and approximately 100 feet long. <br />Scope of Services includes structural design for the bridge, preparation of reproducible <br />drawings, and providing special provisions, quantities, and our opinion of construction cost. <br />ENGINEER will provide design and permitting tasks, as described in the original <br />Professional Engineering Services Agreement, for an expanded project limits described above. <br />The 4"' Street and 80' Street intersections will be designed to provide left turn lanes in all four <br />C.Ncor&o11ice7\Capi1a1 Projeas'V810 Amendment 1.wpd Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.