D <br />• <br />• <br />Smith Warehouse is currently under design and construction may not run concurrently with <br />Woodmere Trade Center. Therefore it is agreed that the DEVELOPER install a 6 -inch sewer <br />force main if the 6 -inch force main is not installed along High Street under the Smith Warehouse <br />Developers Agreement or its sequel. If the force main proposed by the Smith Warehouse <br />Developer's Agreement is not constructed, the DEVELOPER shall furnish and install a 6 -inch <br />PVC force main along the west side of High Street from CR -512 to 2' Street. The <br />DEVELOPER shall make connection to an existing 8 -inch force main located on CR -512. The <br />proposed force main shall extend along Higi Street to the intersection of 2" Street for a total of <br />300 +/- lineal feet. <br />The Developer shall pay line extension fees in the amount of $15.77 per foot of property frontage <br />of the proposed wastewater line. The DEVELOPER'S fee for this portion is tabulated below: <br />Woodmere Rd, F%mage Total Frontage Cost per Front Footage (5/ft.) Developer Cost <br />L— —210 _ 210 _ - —515.77 i 53,311.70 <br />$B K -inch Diameter Water Main along ►Hgh Street from CR-512to 2" Street: <br />The DEVELOPER shall furnish and install a 8 -inch PVC water main along the east Side of High <br />Street from CR -512 to 2`1 Street to Woodmere Road and along the north side of Woodmere Road <br />from High Street to Old Dixie Highway. Make connection to a proposed 8 -inch water main to be <br />located on the east side of High Street and 2' Street, as per the Smith Warehouse Developer' <br />Agreement. The new water main shall extend south along High Street from 2' Street to the <br />intersection of Woodmere Road and travel eastward along Woodmcre to the west right-of-way <br />line of Old Dixie Highway for a total of 947 +/- lineal feet <br />The Developer is relying upon the construction of a water main along High Street to be installed <br />by others (Smith Warehouse Development, Randy Mosby as Engineer -of -Record). Smith <br />Warehouse is currently under design and construction may not run concurrently with Woodmere <br />Trade Center. Therefore it is agreed that the DEVELOPER install an 8 -inch water main if the 6 - <br />inch force main is not installed along High Street under the Smith Warehouse Developer's <br />Agreement or its sequel. If the water main proposed by the Smith Warehouse Developer's <br />Agreement is not constructed, the DEVELOPER shall furnish and install a 6 -inch PVC water <br />main along the east side of High Street from CR -512 to 2"' Street. The DEVELOPER shall <br />make connection to an existing 16 -inch water main located on CR -512. The proposed water <br />main shall extend along High Street to the intersection of 2"' Street for a total of 300 +/- lineal <br />feet. <br />The Developer shall pay line extension fees in the amount of $11.25 per foot of property frontage <br />of the proposed water line. The DEVELOPER'S fee for this portion is tabulated below: <br />Woodmere Rd. Frontage Total Frontage Cost per Front Footage ($/ft.) Developer Cost <br />210 210 -1 511.25 - $2,362.50 <br />.7ar.lopa,Apee -d <br />Woodmen Trade Cada <br />CAStel. NYW FdaT .J d-Wood—T.&C.WeArrarron-D.wlopae Areemad,Wmd-1 Trdo Creta Nov 1999 doe <br />