My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-310
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-310
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2024 3:12:25 PM
Creation date
1/18/2024 3:11:32 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Interlocal Agreement
Approved Date
12/07/1999
Control Number
1999-310
Entity Name
Indian River Farms Water Control District
Subject
Permit & Interlocal Agreements/Yearly Lease Agreements
10" Tertiary Treated Sanitary Sewer Effluent line: (82nd Ave; US Hwy 1 to Lift Station:
Sand Ridge Golf Course So to Hawks Nest Golf Course; Oslo Rd from 27th Ave;
6th Ave SW& Sunrise DR; Storm Grove Road-57h Street to East Hobart Rd-77th St (Cy)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s <br />C. County Reimbursement: <br />Reimbursement shall be in the form of check from the COUNTY, and shall not exceed the <br />amount of 42 809.68 (see Exhibit -B), The COUNTY shall reimburse the DEVELOPER based <br />on an itemized invoice; of installed materials on a percentage comp!ete basis (less 10% retainage) <br />monthly, with final payment and release of retainage at the time the above referenced facilities <br />are dedicated to and accepted by the COUNTY. <br />SC - 2. Amy_nftcnt: <br />A written instrument executed by the party or parties to be bound thereby may only amend this <br />Agreement. <br />SC - 3, Assi ili <br />Either party may assign this Agreement, however, the rights granted herein shall run with the land <br />and are not considered the personal property of the DEVELOPER. Therefore, while the DEVELOPER <br />has the right under this Agreement to freely transfer the rights and obligations granted by this Agreement, <br />the assignee shall not have the right to transfer these rights to another property unless this Agreement is <br />amended in writing by the assignee and the COUNTY to provide otherwise. <br />SC - 4, Authori <br />Each party hereto represents and warrants to the other that the execution of this agreement and any <br />other documents required or necessary to be executed pursuant to the provisions hemof are valid, binding <br />obligations and are enforceable in accordance with their terns. <br />Bidding Award : <br />The Indian River County Department of Utility Services shall review and approve bid proposals and <br />engineering costs related with the Work described herein. At least three (3) bid estimates from qualified <br />utility contractors must be submitted to the Department of Utility Services for review. Approval of <br />project costs will be a condition of the Utility Department's reimbursement for construction. <br />Furthermore, no work shall commence until the Utility Department provides written approval of the final <br />construction cost. The County may require redesign and / or rebid if project costs significantly exceed <br />that contained in Exhibit B. <br />SC - 6. Captions-- <br />Captions, <br />aptions:Captions, if included, in this Agreement are included for convenience only and are not to be <br />considered in any construction or interpretation of this Agreement or any of its provisions. <br />SC 7. Construction Plans, Technical SMcifi_cations and Contract Documents <br />The DEVELOPER agrees to complete a final set of construction drawings and make submission for a <br />Utilities Construction Permit to the Indian River County Utilities Department and Florida Department of <br />Environmental Protection (FDEP). Prior to construction, all permits must be approved. <br />SC - 8. Definition <br />All pronouns shall be deemed to refer to the masculine, feminine, or neuter, singular or plural, as the <br />identity of the party or parties may require. <br />SC - 9 DEVELOPER's Oblivations: <br />The DEVELOPER shall prepare at its own expense, plans, specifications, agreement, advertisement, <br />general conditions, hereinafter referred to has the "contract documents", for the lines and facilities <br />necessary to deliver the water and wastewater utilities from the COUNTY'S facilities. The COUNTY <br />De1awyer'a Ar -1 <br />Woo,bm Trde Center <br />C �S em Doyle Fr;OlProjat - Wood—Trade Cent&AyrMm 1 • Derek M Ago,.. ,% Wacd—e 7 r.& Cd. Nov 1999 doe <br />
The URL can be used to link to this page
Your browser does not support the video tag.