Laserfiche WebLink
40 <br />�7 <br />9 <br />Description: <br />Purpose: <br />Cost: <br />Time: <br />10 <br />Description: <br />Purpose: <br />Cost: <br />Time: <br />11 <br />Description: <br />Purpose: <br />Cost: <br />Time: <br />12 <br />Description: <br />Purpose: <br />Cost: <br />Time: <br />13 <br />Description: <br />i <br />i <br />Purpose: <br />I <br />Cost: <br />Time: <br />o� <br />Rain delays. <br />Extension in contract time as a result of excessive rainfall at the <br />project site for the duration of the project. <br />$0.00 <br />32 days (SC) <br />HVAC modifications in blower and generator buildings. <br />Modifications necessary as a result of roof and electrical design <br />conflicts. <br />$2,700.00 <br />None <br />Additional electrical modifications. <br />Modifications required for inclusion of sump pumps in meter pits <br />and additional receptacles in existing plant administration building. <br />$5,880.00 <br />10 days (FC) <br />Rubber mats for electrical room floors. <br />Code requirement. Not specified in contract. <br />$2,901.00 <br />None <br />Credit for Tera Systems maintenance contract. <br />To facilitate close out of contract. County staff to contract directly <br />with Tera Systems. <br />($143,862.27) <br />None <br />