My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-177B
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-177B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 2:28:22 PM
Creation date
1/19/2024 2:18:36 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/06/1999
Control Number
1999-177B
Entity Name
Summit Construction Management, Inc.
Subject
Contract for Donal MacDonald Park Improvements
Project Number
9625A
Bid Number
9062
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 <br />• <br />F. Do not remove forms for 24 hours after concrete as <br />been placed. After form removal, clean ends of joints <br />and point -up any minor honeycombed areas. Remove and <br />replace areas of sections with major defects, as <br />" directed by Architect. <br />, <br />3.05 CURING: <br />A. Protect and cure finished concrete saving, complying <br />with applicable requirements of Division 3 sections. <br />Use moist --curing methods for initial curing whenever <br />possible, <br />3.06 REPAIRS AND PROTECTION: <br />A. Repair or replace broken or defective concrete, as <br />directed by Architect. <br />B. Drill test cores where directed by Architect, when <br />necessary to determine magnitude of cracks or <br />defective areas. Fill drilled core holes in <br />satisfactory pavement areas with Portland cement <br />concrete bonded to pavement with epoxy resin grout. <br />C. Protect concrete from damage until acceptance of work. <br />Exclude traffic from pavement for at least 14 days <br />after placement. When construction traffic zs <br />permitted, maintain pavement as clean as possible by <br />removing surface stains and spillage of materials as <br />they occur. <br />D. sweep concrete pavement and wash free of stains, <br />discolorations, dirt and other foreign material -just <br />Prior to final inspection. <br />***PND OF SECTION*** <br />02515-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.