My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-177B
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-177B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 2:28:22 PM
Creation date
1/19/2024 2:18:36 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/06/1999
Control Number
1999-177B
Entity Name
Summit Construction Management, Inc.
Subject
Contract for Donal MacDonald Park Improvements
Project Number
9625A
Bid Number
9062
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 <br />0 <br />F <br />3.02 RENDING <br />{ <br />A. General <br />1. Fabricate all reinforcement in strict accordance <br />r with the approved Shop Drawings and ASTM A-615. <br />2. Do not use bars with kinks or bends not shown on <br />the Drawings or on the approved Shop Drawings. <br />i 3. Do not bend or straighten steel in a manner that <br />will injure the material. <br />3.03 PLACING <br />A. General: <br />1. Before the start of concrete placement, <br />accurately place all concrete reinforcement, <br />positively securing and supporting by means of <br />approved metal chairs, spacers, and metal <br />hangers. <br />a. Clearance <br />1. Preserve clear space between bars of not less <br />than one and one-half (1-1/2) times the nominal <br />diameter of round bars. <br />2. Provide minimum concrete covering of <br />reinforcement as .shown or noted on the Drawings, <br />3.04 CLEANING REINFORCEMENT <br />A. Steel reinforcement, at the time concrete is placed <br />around it, shall be free from rust scale loose mill <br />scale; nil paint, and all othor coatings which will <br />destroy or reduce the bond between steel and <br />concrete. <br />PART 4 - ITEM OF PAYMENT <br />No separate Payment shall be made for work specified <br />in this Section; Payment for work specified in this <br />Section shall be included in Payment made for other <br />sections. <br />***END OF SECTION*** <br />03200-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.