My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-177B
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-177B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 2:28:22 PM
Creation date
1/19/2024 2:18:36 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/06/1999
Control Number
1999-177B
Entity Name
Summit Construction Management, Inc.
Subject
Contract for Donal MacDonald Park Improvements
Project Number
9625A
Bid Number
9062
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
do <br />11 <br />r <br />t, involved. Remove temporary grounds when no longer <br />required. <br />3.03 WOOD FURRING (WD -FUR)_ <br />{ <br />A. Install1p umb and level with closure strips at edges <br />and openings. Shim with wood as required for <br />tolerance of finished work. <br />r <br />B. Furring to Receive Plywood Paneling: Unless otherwise <br />shown, provide 1'1x3" furring at 2'o.c., horizontally <br />anm vertically <br />3.04 WOOD FRAMING. GENERAL (WD-FRM) <br />A. Provide framing members of sizes and on spacings <br />shown, and frame openings as shown, or if not shown, <br />comply with recommendations of "Manual for House <br />Framing" of National Forest Products Association. Do <br />not splice structural members between supports. <br />B. Anchor and nail as shown, and to comply with <br />"Recommended Nailing Schedule" of "Manual for Housing <br />Framing" and other recommendations of the N.F.P.A. <br />3.05 INSTALLATION OF PLYWOOD (PWD) <br />A. Comply with recommendations of the American Plywood <br />Association (APA), for the installation of plywood. <br />3.06 GENERAI, REQUIREMENTS <br />1. All work shall comply with the standards of the American <br />Institute of Timber Construction, AWI, API, AWPA and local <br />codes and regulations. <br />2. All framing shall be square, plumb and true. <br />3. All Curring shall be shimmed to a plumb, 4ru.3 surface. <br />A.. All lumber in contact with masonry shall be #2 yellow pine, <br />pressure treated. <br />5. Coordinate blocking and backing requirements of all trades and <br />provide where indicated and required. <br />6. Provide solid blocking behind all shower valves. <br />7. Provide rough openings for all manufactured items such as <br />medicine cabinets, fire extinguisher cabinets, etc. <br />8. Provide fire cats in all interior and exterior frame <br />walls where vertical cavity exceeds 8 feet. <br />9. Construct 3/4 inch BC plywood plenum bases, includinS vertical <br />sides, for all Closet Mounted Air -Handling units. <br />*** END SOF SECTION *** <br />06100-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.