Laserfiche WebLink
40 <br />SECTION 07514 - METAL ROCIFINC� <br />Part I GENEi2AI, <br />1.01 The roof panels, flashings, and all accessories shall be <br />manufactured by Southeastern Metals Manufacturing Company, <br />Inc. <br />1.02 Storage and handling: Store panels and materials properly <br />and adequately to protect from damna and entrapped water. <br />1.03 Warranty: Submit a written three (3j year warranty <br />from installer and manufacturer against leaks, defective <br />workmanship and materials. submit manufacturer's written <br />finish warranty that applies. <br />1.04 References: S.M.A.C.N.A. (Sheet Metal and Air Conditioning <br />Contractor's National Association). <br />PART II PRODUCTS <br />2.01 Metal Roofing: as manufactured by Southeastern Metals <br />Manufacturing Corp. Inc. <br />2.02 Panels: Panel configuration to be 5-V Crimp, Single Lengths, <br />26 Gauge, 24" wide, Color: Forrest Green with 20 Year SEMCOAT <br />paint system. Install panels over 'TAMKO Nail -Fast KRATON <br />SBS -Modified Bitumen utility sheet, 80 mils thick, roll <br />weight 86lbs., roll dimension 72' x 3611, square feet per roll <br />216, installed per manufacturers specifications. <br />2.03 Exposed fastening. are to be ff9 x 1 1/2" stainless steel <br />woodfast hexhead screws with bonded neoprene washers. Install <br />at spacings per manufacturer's specifications at perimeters <br />and field. <br />2.04 Flashings: are to be of the same gauge, material and finish. <br />2.05 Accessories: All accessories must be of compatable materials <br />to the metal panels. <br />PART III INSTALLATION <br />3.01 Install roofing systems per the manufacturer's specifica- <br />tions. <br />3.02 Installers shall be a certified installers, certified by the <br />manufacturer of the respective roofing systems. Written <br />proof of certification shall be provided to the Architect <br />prior to installation. <br />3.03 rrpon completion of the roofing symLem instailarion, an <br />inspection will be made by a roofing system representative. <br />Corrections to the installation of the roofing system, as <br />deemed necessary by the roofing system representative, will <br />be made at no additional cast to the Owner in order that the <br />Warranty may be issued. _ <br />***ENA OF SECTION*** <br />07510-1 <br />