Laserfiche WebLink
C] <br />I' <br />L Prepare the surface as recommended, <br />2. Apply Dur -A -Glaze #4 at approximately 100 sq. ft. per gallon. <br />3. Broadcast Q28 Colored Quartz at approximatcly 112 ib. per sq. ft. <br />4. Let cure. (Cure tunes vary depending on hardener selection, from 2 to 10 hours.) <br />5. Sweep up excess sand. <br />" 6, Apply Dur -A -Glaze #4 at approximately 100 sq. ft. per gallon. This application serves as a <br />base coat for a second broadcast. <br />7. Broadcast Q28 Colored Quartz at approximately 1/2 lb. per sq, ft, <br />8. Repeat steps 4 & 5. <br />9. Apply fust top coat of Dur -A -Glaze #4 at 140-125 sq. ft. per gallon, <br />10. Let cure. <br />11. Apply second topcoat of Dar -A -Glaze #4 at 200-250 sq. ft. per gallon, or any Dur -A -Flex <br />high performance topcoat such as Poly -Thane 42, Dur -A -Thane or Dur -A -Glaze #2 at 200-300 <br />sq. ft. per gallon. <br />NOTE. One top coat is generally sufficient where a high degree of non-skid is required <br />(Standard). Example: shower rooms, meat cutting rooms, oily plant floors, etc. An additional top <br />coat is often required for areas such as locker rooms, classrooms, showrooms, laboratories, etc. <br />(©range feel). An additional topcoat is often eased to yield a higher degree of sheen and <br />cleanability (Smooth). <br />3.03 DETAILS <br />A. Moving cracks and joints shall be thoroughly routed and vacuumed clean, then filled with <br />DUR-A-FILLER #2. <br />B3 Slarface deviatinnW to !-- pre.'paatChcd with patchhag compound uoutprised of DUR-A-GLAZE <br />#4 and Ido -Sag #2 or Q28 Quartz. <br />C. A 4" or 6" integral cove base to be installed at perimeter walls. <br />D. Prime surface wish Elast-O-Coat membrane as per manufacturer's recommendation. <br />0970-4 <br />