My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-177B
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-177B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 2:28:22 PM
Creation date
1/19/2024 2:18:36 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/06/1999
Control Number
1999-177B
Entity Name
Summit Construction Management, Inc.
Subject
Contract for Donal MacDonald Park Improvements
Project Number
9625A
Bid Number
9062
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 <br />11 <br />PART 2 - PRODUCTS <br />2.01 MATERIALS <br />1 A. Colors & Patterns: As selected by owner from <br />Manufacturers standard products. <br />B. Fiberglass Wall Panel.: <br />1. Size: 4' x 10' <br />2. weight: 7 lb. per sq.ft. <br />3. Thickness: .09 in. <br />4. Flame Spread: Class C (III) <br />5. Smoke Developed: Under 450 <br />6. Mater Absorption: .169c <br />C. Accessories; <br />I. Molding/Trim: Color matched, non -staining vinyl <br />2. Caulk and Adhesives_: Construction grade adhesives <br />and clear silicone sealant per manufacturers <br />recommendations. <br />3. Fasteners: Non -corroding mechanical fasteners per <br />manufacturers recommendations. <br />PART 3 - EXECUTION <br />3. 01 INSPECT ION <br />Installer must examine areas and conditions under which <br />fiberglass panels and accessories are to be installed <br />and must notify Contractor in writing of conditions <br />detrimental to proper and timely completion of work. iso <br />not proceed with work until unsatisfactory conditions <br />have been corrected in manner acceptable to Installer. <br />3.02 PREPARATION <br />Subwalls must be flat, clean, dry, and free of all dirt, <br />dust or grease. start of paneling installation <br />indicates acceptance of subwall conditions and full <br />responsibility for completed work. <br />3.03 EXECUTION <br />A. Fol ow manufActurers recommendations for <br />installation, attachment, caulking and trim <br />applications. Caulk all -pipes and other wall, <br />penetrations. <br />B. Install all panels in a true and even plane. <br />3.04 CLEANINGA1JQ REPLACEMENT <br />k031gvri29 i.rastallat_ on_ clean soiled or discolored <br />surfaces of units. Remove and replace units which are <br />damaged or improperly installed. <br />89986-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.