My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-177B
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-177B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 2:28:22 PM
Creation date
1/19/2024 2:18:36 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/06/1999
Control Number
1999-177B
Entity Name
Summit Construction Management, Inc.
Subject
Contract for Donal MacDonald Park Improvements
Project Number
9625A
Bid Number
9062
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. If cracks or checks appear in the mase which would impair the stntctural <br />hacgrity of the base in the opinion of the Engineer, the Contractor shall <br />remove the cracks or checks by rescarifying, reshaping. refilling will, coquina <br />shell where necessary, and reconipacting at no cost to (lie Owner. <br />E. The finished coquina shell base shall be checked for thickness at intervals of <br />not mgre than 300 feel. Any areas which are less than 5 112 inches in thickness <br />shall be corrected by scarifying and adding rack. The scarifying shall extend <br />for 50 feet either side of the deficient area. Areas which are less than 112 incl, <br />deficient in thickness shall be corrected if tate Engineer determines that the <br />area is extensive or may adversely affect the quality of the finished work. <br />fn. PRIME COAT <br />A. The prime coat shall be a rapid curing liquid cut back asphalt equal or <br />equivalent to RC -70 or RC -250 at the Contractor'so tion, asid conforming to <br />Sections 300 and 916-2 of the 19$5 Edition of site torida D.O.T. Standard <br />Specifications for Road and Bridge Construction. <br />B. The surface of the base material shall be cleaned after final compaction and <br />(lie moisture content of (lie base shall not exceed 90 percent of the optimum <br />moisture before the prime coat is applied. The prime coat :shall he applied <br />uniforttily with a pressure distributor. The entire length of the spray bar shall <br />be set at [lie height above the surface recommended by the Manufacturer for <br />even distribution. The prime coat shall be applied to the finished base course <br />at [he rale of 0.15 gallons per square yard at a temperature between 1001 F. <br />to 1501 F. The prime coat shall be applied such that a period of no longer <br />than two (2) hours lapse prior to application of [lie asphaltic concrete wearing <br />course, unless [lie pritne coat is covered with sand or screenings as outlined in <br />Section: 300-6.5 of the 1986 Edition of the Florida D.O.T. Spec iifications. <br />7. TESTING <br />A. The inaximwn density and optimum moisture shall be determined in <br />accordance with the Modified Proctor Test procedures of ASTM -D1557 or <br />AAS11TO-T18O {Method 1)). The percentage compaction and in-place <br />density shall be determined according to procedures of ASTM -1)2167 "Test <br />for Density of Soil In -Place by (lie Rubber Balloon Method" or the nuclear <br />inelhod ASTM- 02922. Its general, one Modified Proctor `fest per 3016 lineal <br />feet of roadwork shall be performed on a representative sample of base <br />material from locatinn(s) designated by the Engineer. inti -phare ,tensity <br />testing shall be performed at the rate of one test per 300 lineal feet of <br />roadwork at comparable locations unless otherwise specified by (lie Engineer.. <br />02304.2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.