CHANGE ORDER NO. 1
<br />DESCRIPTION OF ITEMIZED CHANGES
<br />PROJECT NAME: INDIAN RIVER BLVD. RESURFACING FROM 53RD ST. TO THE MERRILL BARBER BRIDGE
<br />PROJECT NO. IRC -1707 BID NO. 2018062
<br />FDOT FM NO. 441919-1-64-01
<br />item No.
<br />Description
<br />Unit
<br />Quantity
<br />` Unit Price
<br />Price Increase
<br />Price Decrease
<br />070813A
<br />RAISED PAVEMENT MARKER, TYPES (BI-DIRECTIONAL
<br />WHITE/RED)
<br />EA
<br />537
<br />4.25
<br />2,282.25
<br />0711 18 102
<br />THERMOPLASTIC, STANDARD -OTHER SURFACES, WHITE, SOLID,
<br />8"
<br />GM
<br />0.16
<br />6,900.00
<br />1,104.00
<br />0711 16 131
<br />THERMOPLASTIC, OTHER -SURFACES, WHITE, SKIP. 6", 10.30 SKIP
<br />OR 3-9 LANE DROP
<br />GM
<br />0.06
<br />2 000.00
<br />120.00
<br />071116201
<br />THERMOPLASTIC, STANDARD -OTHER SURFACES, YELLOW,
<br />ISOLID. 6"
<br />GM
<br />0.119
<br />6300.00
<br />1 749.70
<br />WCD-2
<br />057012 PERFORMANCE TURF SOD BAHIA
<br />SY
<br />2,997
<br />4.50
<br />13486.50
<br />WCD-2
<br />05701 2A PERFORANCE TURF SOD FLORATAM
<br />SY
<br />3,997
<br />TDO
<br />27 979.00
<br />WCD-2
<br />0630212 CONDUIT F81 DIRECTIONAL BORE
<br />LF
<br />1 741
<br />21.00
<br />15561.00
<br />WCD-2
<br />REMOBILIZATION OF DIRECTIONAL DRILLING
<br />LS
<br />1
<br />2.750.00
<br />2,750.00
<br />WCO-4
<br />PAY ITEM 042514 1 GRATE FOR EXISTING DRAINAGE STRUCTURE
<br />SF
<br />55.58
<br />334.00
<br />18,563.72
<br />0630211
<br />CONDUIT FURNISH & INSTALL, OPEN TRENCH
<br />LF
<br />1,5W
<br />8.70
<br />10 452.00
<br />070613
<br />RAISED PAVEMENT MARKER, TYPE 8 (SI -DIRECTIONAL
<br />AMBER/AMBER)
<br />FA
<br />1
<br />4.25
<br />4.25
<br />0706138
<br />RAISED PAVEMENT MARKER, TYPE B (BI-DIRECTIONAL
<br />WHITE/MONO)
<br />EA
<br />71
<br />4.25
<br />301.75
<br />071111123
<br />THERMOPLASTIC, STANDARD, WHITE, SOLID, 12" FOR
<br />CROSSWALK AND ROUNDABOUT
<br />LF
<br />1 265
<br />1 2.35
<br />622.75
<br />0711 11124
<br />THERMOPLASTIC, STANDARD, WHITE, SOLID, 18" FOR
<br />DIAGONALS AND CHEVRONS
<br />LF
<br />306
<br />3.65
<br />1,116.90
<br />071111123
<br />THERMOPLASTIC, STANDARD, WHITE, SOLID, 24" FOR STOP LINE
<br />fAND CROSSWALK
<br />LF
<br />41
<br />7.30
<br />299.30
<br />071111141
<br />THERMOPLASTIC, STANDARD, WHITE, 24 DOTTED GUIDELINE/6-
<br />10 GAP EXTENSION, 6"
<br />GM
<br />1.29
<br />2.200.00
<br />2,831.40
<br />0711 11160
<br />THERMOPLASTIC, STANDARD, WHITE, MESSAGE OR SYMBOL
<br />HELMETED BICYCLE SYMBOL AND BIKE LANE ARROW
<br />EA
<br />1
<br />338.00
<br />336.00
<br />0711111608(ONLY)
<br />THERMOPLASTIC, STANDARD, WHITE, MESSAGE OR SYMBOL
<br />EA
<br />1
<br />337.00
<br />337.00
<br />0711 11170
<br />THERMOPLASTIC STANDARD, WHITE ARROW
<br />EA
<br />1
<br />92.00
<br />92.00
<br />071111224
<br />THERMOPLASTIC, STANDARD, YELLOW, SOLID, 18" FOR
<br />DIAGONAL OR CHEVRON
<br />LF
<br />159
<br />3.00
<br />477.00
<br />0711 11241
<br />THERMOPLASTIC, STANDARD, YELLOW, 2-4 DOTTED GUIDELINE/6
<br />10 DOTTED EXTENSION LINE 8"
<br />GM
<br />0.095
<br />3 700.00
<br />351.50
<br />071116101
<br />THERMOPLASTIC, STANDARD -OTHER SURFACES, WHITE, SOLID,
<br />6"
<br />GM.
<br />0.174
<br />6,300.00
<br />1096.20
<br />WCDI
<br />ESUILDER ISSUE
<br />LS
<br />1.000
<br />822.81
<br />622.81
<br />FA
<br />FORCEACCOUNT
<br />LS.
<br />1
<br />385000.00
<br />365000.00
<br />SUBTOTALS
<br />I 1
<br />1
<br />82,696.17 1 383,942.86
<br />INDIAN RIVER BLVD. RESURFACING FROM 53RD ST. TO THE
<br />MERRILL BARBER BRIDGE TOTAL
<br />$ (301,346.69)
<br />F.VTbfe Waln\FJ101NEERINe CM91g11'1101EC16\ITpI hMtn Rm, �eaMmAevEs seal.b311!31wvaeYe IBCo�N'-�dI.11NAglid. NxnVraygt7ou J( 1]0f_FCCxR31121
<br />
|