My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-325
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-325
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2024 8:44:20 AM
Creation date
1/29/2024 8:42:50 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
12/14/1999
Control Number
1999-325
Entity Name
Department of Community Affairs
Subject
Disaster Relief Funding Agreement/Hurricane Floyd
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 <br />represents and warrants that the presence of any condition(s) or <br />material(s) on site, which is subject to Federal, State or local <br />laws and regulations (including but not limited to: above ground <br />or underground storage tanks or vessels, asbestos, pollutants, <br />irritants, pesticides, contaminants, petroleum products, waste, <br />chemicals, and septic tanks), shall be handled and disposed of in <br />accordance with the pertinent requirements. <br />20. REPORTS: The Subgrantee shall provide quarterly progress <br />reports to the Grantee, using the attached Quarterly Report Form, <br />�i Attachment F. Refer to the "Quarterly Report Schedule and <br />Instructions" (Attachment G) for the due date of the first <br />report. 'Reports are due quarterly thereafter until the work has <br />been completed and approved through final inspection. Reports <br />shall indicate the status and completion date for each project <br />funded, any problems or circumstances affecting completion dates, <br />or the scope of work, or the project costs, and any other factors <br />reasonably anticipated to result in noncompliance with the terms <br />of the grant award. Interim inspections shall be scheduled by <br />the Subgrantee prior to the final inspection and may be required <br />by the Grantee based on information supplied in the quarterly <br />reports. The Grantee may require additional reports as needed. <br />The Subgrantee shall, as soon as possible, provide any additional <br />reports requested by the Grantee. The Grantee contact will be <br />the State Public Assistance officer for all reports and requests <br />for reimbursement. <br />Page 0 f MA -1300 -DR -M <br />
The URL can be used to link to this page
Your browser does not support the video tag.