My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-003B
CBCC
>
Official Documents
>
2020's
>
2024
>
2024-003B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2024 10:32:26 AM
Creation date
1/30/2024 10:19:23 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
01/09/2024
Control Number
2024-003B
Agenda Item Number
8.L.
Entity Name
Ardaman and Associates, Inc.
Subject
Contract Agreement for Continuing Geotechnical Engineering Consulting Services
Document Relationships
2024-003A
(Cover Page)
Path:
\Official Documents\2020's\2024
2024-003C
(Agenda)
Path:
\Official Documents\2020's\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,. Ardaman & Associates, Inc. 460 NW Concourse Place, Unit 1 <br />Geotechnical, Environmental and Port St. Lucie, Florida 34986 <br />Materials Consultants 772 T7272-87072 (office) <br />778-0097 (fax) <br />wmv.ardaman.com <br />EXHIBIT "'I" <br />ARDAMAN & ASSOCIATES, INC. <br />FEE SCHEDULE <br />INDIAN RIVER COUNTY <br />GEOTECHNICAL AND ENVIRONMENTAL ENGINEERING <br />AND CONSTRUCTION MATERIALS TESTING SERVICES <br />(Effective 12/3/23 through 12/2/25) <br />SPECIAL DRILLING/SOUNDING <br />Prices for special drilling (barge drilling; air boat sampling; amphibious drilling: NQ wire line coring: large diameter borings; <br />drilling in corrosive, contaminated or hazardous materials: drilling at great depths; installing large diameter temporary <br />casing; etc.) field vane testing, and other specialized sampling or field tests will be determined per project. <br />OTHER DRILL RIG CHARGES <br />Clearing Difficult Access, Hole Location and Set-Up......................................................................................... $286.00/hour <br />Standby Time (drillers)..................................................................................................................................... $286.00/hour <br />Piezometer and Well Installation (plus materials)............................................................................................. $286.00/hour <br />Bore Hole Grouting and Sealing (plus materials) .................................. ............................................................ $286.00/hour <br />Materials............................................................................................................................................................ Cost+ 15% <br />Barge Borings........................................................................................................................ Normal drilling rates times 1.5 <br />ATV Borings........................................................................................................................... Normal drilling rates times 1.5 <br />INSTRUMENTATION <br />Prices for installation of monitor wells, inclinometers and settlement devices and prices for performing field permeability and <br />packer tests will be determined per project. <br />GENERAL FIELD EQUIPMENT: <br />Generator.......................................................................................................................................................... <br />$111.00/day <br />SteamCleaner.................................................................................................................................................. <br />$111.00/day <br />Surveying Equipment (Water Table Elevations)................................................................................................... <br />$74.00/day <br />PeristalticPurging Pump..................................................................................................................................... <br />$56.00/day <br />pH/Conductivity Meter......................................................................................................................................... <br />$38.00/day <br />TurbidityMeter..............................................................................................................................................I..... <br />$62.00/day <br />WaterLevel Indicator........................................................................................................................................... <br />$28.00/day <br />EXPENDABLE SUPPLIES: <br />High Capacity (0.45 micron) Filter..................................................................................................................... <br />$28.00/each <br />DisposableTeflon Bailer.................................................................................................................................... <br />$23.00/each <br />Disposable Polyethylene Bailer......................................................................................................................... <br />$17.00/each <br />Isopropyl Alcohol (decontamination)................................................................................................................ <br />$17.00/gallon <br />Deionized Water (decontamination) ................................................................................................................... <br />$6.00/gallon <br />16 oz. Soil Jars (soil headspace analysis)............................................................................................................ <br />$17.00/box <br />TygonTubing........................................................................................................................................................ <br />$4.00/foot <br />PolyethyleneTubing................................................................................................................................................ <br />$1.00/foot <br />55 -gallon Drum..................................................................................................................................................$85.00/drum <br />HEAVY EQUIPMENT: <br />Vacuum Truck, Dump Truck, Crane, Excavator, Trackhoe, Backhoe, etc........................................................... Cost + 15% <br />ENVIRONMENTAL SITE ASSESSMENTS <br />Phase I Environmental Site Assessments <br />Tracts 50 acres or less (contiguous properties or per individual tract) ....................................................$2,100.00 Minimum <br />Tracts between 51 and 500 acres (contiguous properties)......................................................................$2,500.00 Minimum <br />Tracts greater than 500 acres..................................................................................................................... varies by project <br />Phase II Environmental Site Assessments <br />varies by project <br />Analytical Laboratory testing for hazardous or petroleum contamination <br />(soil, sediment and groundwater)......................................................................................................................... cost + 15% <br />460 NW Concourse Place, Unit 1 Port St. Lucie, Florida 34986 772-878-0072 (office) 772-878-0097 (fax) Page4 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.