My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/12/2023
CBCC
>
Meetings
>
2020's
>
2023
>
12/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2024 12:23:22 PM
Creation date
1/30/2024 11:37:28 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Workshop Meeting
Document Type
Agenda Packet
Meeting Date
12/12/2023
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
514
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 2 — Structural Analysis Report with Modifications <br />Based on the overstressed structural components identified per the analysis report per <br />Task 1, Kimley-Horn will perform a supplemental structural analysis of the water tank <br />structure in general accordance with Florida Building Code 7t' Edition (2020) and <br />American Water Works Association (AWWA) D100-21. The purpose of the structural <br />analysis is to determine the adequacy of the structure to support existing and proposed <br />loading by multiple telecommunication carriers (Verizon, T -Mobile, and Metro PCS), <br />includin>; proposed structural modifications required to meet referenced code <br />requirements. <br />The analysis report will only evaluate the primary latticed structural elements such as <br />the columns, sway rods, and horizontals. Evaluation of the tank shell, catwalk, and <br />carrier mounts will not be included. <br />Task 3 — Modification Design Drawings <br />Kimley-Horn will produce a structural modification drawing package detailing the <br />reinforcements and modifications required to bring the elevated water tank structure <br />into compliance with the Florida Building Code 7t' Edition (2020) and American Water <br />Works Association (AWWA) D100-21. <br />In addition to modifications required to address overstressed structural components, the <br />drawings will also detail reinforcements required to address critically deficient <br />structural components identified in the Kimley-Horn condition assessment report dated <br />06/10/2022. <br />The modification drawings will only address modifications required for the primary <br />latticed structural elements such as the columns, sway rods, and horizontals. Evaluation <br />of the tank shell, catwalk, and carrier mounts will not be included. <br />Task 4 — Bidding Assistance <br />Consultant will attend one prebid meeting with the Owner. <br />Consultant will coordinate with IRCDUS staff and IRC purchasing department to assist <br />with project advertisement. Consultant will respond to up to two (2) addenda. <br />Consultant will review bids from Contractors and prepare a letter for IRCDUS that <br />identifies the lowest, most responsible, most responsive bidder. <br />Task 5 — Construction Phase Assistance <br />Consultant will attend pre -work meeting with Contractor. Consultant will prepare <br />meeting minutes and distribute to project team. <br />K:\WPB_Civil\General\King\Marketing\IRCDUS\Gifford Water Tank\2023.11.27 - Gifford Water Tank Modification - Scope <br />(MRD Edits).doc <br />175 <br />
The URL can be used to link to this page
Your browser does not support the video tag.