My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/6/1996
CBCC
>
Meetings
>
1990's
>
1996
>
8/6/1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:05:51 PM
Creation date
6/17/2015 9:53:37 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
08/06/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />poc� 98 7.25 <br />ON MOTION by Commissioner Eggert, SECONDED by <br />Commissioner Bird, the Board unanimously approved <br />the developer's agreement with X -L Realty, Inc., as <br />recommended in the memorandum. <br />AGREEMENT HAS BEEN PLACED ON FILE <br />IN THE OFFICE OF THE CLERK TO THE BOARD <br />26TH STREET WATER MAIN PROTECT - TRI -SURE CORPORATION - <br />CHANGE ORDER NO. 1 <br />The Board reviewed a Memorandum of July 18, 1996: <br />DATE: JULY 18, 1996 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRA' <br />FROM: TERRANCE G. <br />DIRECTOR OF <br />J� <br />PREPARED WILLIAM F. McCAI P. . <br />AND STAFFED CAPITAL PROSE INEER <br />BY: DEPARTMENT OF TY SERVICES <br />SUBJECT: 26TH STREET WXTER MAIN PROJECT CHANGE ORDER NO 1 <br />INDIAN RIVER COUNTY PROJECT NO. UW -94 -09 -DS <br />BACKGROUND <br />On January 2, 1996 the Indian River County Board of County <br />Commissioners approved a contract with Tri -Sure Corporation for <br />the above -referenced project. The awarded contract was in the <br />amount of $838,750.00. (See attached agenda item and minutes) <br />As a result of several necessary changes in the project scope, a <br />change order is required to modify the original contract amount. <br />(See attached change order) <br />ANALYSIS <br />The major required contract modifications and the associated <br />costs are as follows: <br />1) 1,400 linear feet line extension between 84th and 82nd <br />Avenues to complete a proposed master planned water <br />main loop. Cost: $56.522.00. <br />2) Temporary bridge crossing at the Indian River Farms <br />District at 66th to accommodate the box culvert <br />installation at 66th by Public Works. <br />Cost: $24.975.00. <br />3) Various water main stub outs for Public Works Rights - <br />of -Way. Cost:$ 8.400.00. <br />4) Various quantity adjustments during construction. <br />Credit: (-$57.058.00) <br />The revised contract is in the amount of $871.589.00 equating <br />to a contract increase of $32.839.00. All additional work is <br />based on the contract unit prices or negotiated lump sums. The <br />Utilities Department wishes to proceed with the additional work. <br />The staff of the Department of Utility Services.recommends that <br />the BCC approve the attached Change Order No. 1 as presented. <br />22 <br />August 6, 1996 <br />
The URL can be used to link to this page
Your browser does not support the video tag.