Laserfiche WebLink
GR"MATTER <br />TO: <br />Cc: <br />FROM: <br />PROJECT: <br />GMS PROJECT NO. <br />CUSTOMER PO: <br />CHANGE TITLE: <br />ISSUE DATE: <br />Dan Russell <br />Jeff Dunham, Kemell Kassim, Aaron Cromer <br />Mandy Urey <br />Indian River Utilities — Industrial Control Systems Network Design <br />1982 <br />RFP# 2022014 <br />Updated Drawings based on RIO changes <br />November 2, 2023 <br />1 DESCRIPTION OF CHANGE <br />Sites have made changes based on new design around Rio that will require the design documents <br />to be updated. This includes attending vendor meetings and follow ups, documentation review, <br />and updating the following: asset inventory, diagrams, documents, BOMs, estimates, firewalls, IP <br />Scheme, and Virtualization. Meetings to begin immediately to get additional detail. All work will <br />be completed remotely, no travel is included in this change notice. <br />2 CHANGE REQUESTED BY <br />Indian River Team <br />3 ESTIMATED EFFECT ON COST: <br />4 EFFECT ON SCHEDULE <br />❑ This item will not impact the engineering schedule. <br />Page 1 of 2 <br />WWW.GRAYMATTERSYSTEMS.COM 1 100 GLOBAL VIEW DRIVE WARRENDALE, PA 15086 ( 1-877-741-2410 <br />106 <br />