Laserfiche WebLink
5. Prior to issuance of a certificate of completion for Phase 1, the developer shall: <br />a. Pass the final inspection for each the building permit for each respective masonry wall. <br />b. Install the northbound left and southbound right turn lanes on Highway AIA. <br />6. The developer shall establish the required 10' wide limited access easement and 30' wide Jungle Trail <br />buffer easement prior to or via the Phase 1 final plat. <br />ATTACHMENTS: <br />1. Location Map <br />2. Aerial <br />3. Conceptual PD Plan <br />4. Conceptual Landscape Plan <br />5. PD Rezoning Ordinance <br />C:\Granicus\Legistar5\L5\Temp\3fOc5f79-d413-41d1-8479-f1 ac8476495f docx 14313 <br />