My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/05/2023
CBCC
>
Meetings
>
2020's
>
2023
>
12/05/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2024 11:55:15 AM
Creation date
2/1/2024 11:32:58 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/05/2023
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IV. PROJECTED OUTCOMES <br />How many total derelict vessels are there in the project's jurisdiction? What percentage of the total derelict <br />vessels located within the project's jurisdiction will be removed by this project? (Limited to those listed in <br />the Statewide Derelict Vessel Database). <br />There are currently fourteen open derelict vessel cases in Indian River County. There are currently <br />four derelict vessels authorized for removal. Indian River County intends to remove 29% of the <br />open vessels cases, 100% of the authorized derelict vessels within the County. <br />b. Describe the system to be used in demonstrating complete removal and destruction of the removed vessel(s). <br />Include the procedure to verify contractor's completeness in removal of the vessel(s). <br />A marine barge and crane will be used to lift and remove derelict vessels from the waters of the <br />Indian River Lagoon. FWC Removal Guidelines will be followed to prevent impacts to the waters <br />and surrounding area. The barge will transport removed vessels to the boat ramp for removal where <br />they will be disposed of at an authorized landfill. Coastal Engineering staff will observe the removal <br />process, documenting removal and disposal, including the inclusion of photos and landfill tickets in <br />the final report. Upon completion of the removal, Coastal Engineering staff will inspect the location <br />to insure all debris has been removed. FWC Law Enforcement will be notified prior to removal and <br />upon removal completion with documentation. <br />V. BUDGET <br />Has a detailed cost estimate/proposal been developed for this derelict vessel removal project? If yes, attach a copy of <br />application. <br />VI. <br />a. ❑ Federal <br />b. Grant Name: <br />c. Approval Status <br />❑✓ YES ❑ NO <br />OTHER SOURCE OF FUNDS (STATUS) <br />❑ State/Local ❑ Loan <br />❑ Approved ❑ Pending <br />Agency: <br />Amount: <br />Intend to Apply, Date: <br />79 <br />
The URL can be used to link to this page
Your browser does not support the video tag.