My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-338A
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-338A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2024 1:27:00 PM
Creation date
2/6/2024 1:13:02 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
12/21/1999
Control Number
1999-338A
Entity Name
Summit Construction Managerment Inc.
Subject
Addendum 1 Round Island Park
Project Number
9622
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C-1 <br />made without bedding material interference. <br />2) At the option of the Contractor, Class B Bedding may be used in <br />place of Class C (Ordinary Bedding) provided that the exercise of <br />this option shall create no additional expense to the Owner. The <br />Contractor shall notify the Engineer in writing of those portions of <br />the project on which he proposes to exercise this option. <br />CLASS C (ORDINARY BEDDING) <br />1) The bottom of the trench shall be hand shaped to provide a <br />firm bedding for the utility pipe. The utility shall be firmly <br />bedded in undisturbed firm soil. The bedding shall be shaped so <br />that the pipe will be in continuous contact therewith for its full length <br />and shall provide a minimum bottom segment for the pipe equal <br />to 0.6 of the outside diameter of the barrel. Excavation under the <br />bell shall be sufficient so that the bell does not support the pipe <br />and the joint can be made without interference. <br />D. UNSUITABLE BEDDING MATERIAL <br />1) Class C Bedding shall be used for all pipeline construction <br />unless otherwise shown on the Drawings or unless unsuitable <br />material is encountered at the bedding surface. In the event that <br />the materials encountered at normal bottom of trench <br />excavation are, in the judgment of the Engineer, unsuitable to act <br />as foundation for the pipe, such material shall be excavated for the <br />full width of the trench to the depth necessary to obtain a suitable <br />foundation. The Engineer will notify the Contractor, in writing, <br />of the necessity for and extent of the material to be removed <br />and the Contractor shall remove such unsuitable material as <br />soon as possible and backfill in accordance with the requirements <br />for Class B Bedding. All unsuitable material shall be disposed of <br />by the Contractor. <br />PIPE TRENCH BACKFILL <br />A. INrrLkL BACKFILL <br />1) Initial backfill shall be placed as soon as possible after laying the <br />pipe and shall maintain a pace with the pipe laying so that no more <br />than five pipe joints separate laying and backfilling operations. <br />Initial back rill shall include all haunching and backfill from the top <br />of the bedding to a compacted depth of twelve inches over the pipe. <br />All haunching and backfilling shall be done in the dry. <br />2) Initial backfill shall be done as specified below: <br />(a) Haunching of the pipe shall be by hand placement <br />and compaction of material in maximum 4 inch layers from the <br />bottom of the trench to the springline of the pipe, taking care to <br />fill all voids below and around the pipe. Backfilling shall be <br />carefully continued in layers riot exceeding 6 inches in thickness <br />for the full trench width until the compacted fill is 12 inches above <br />the top of the pipe. <br />(b) During initial backfilling the fill shall be deposited evenly <br />along both sides of the pipe from a height not to exceed 2 feet above <br />2Q.4 ima <br />
The URL can be used to link to this page
Your browser does not support the video tag.