Laserfiche WebLink
40 <br />ADDENDUM ##Z <br />ROUND ISLAND PARK <br />8/20/99 <br />To: All prospective bidders <br />From: Pat Walther <br />Prepared by: Pat Walther <br />1.4 SR A1A Right -of -Way <br />The following described changes should he acknowledged by the Contractor <br />and incorporated into his bid. These changes apply only to the Sit. A 1 A right- <br />of-way only: <br />A. Do not saw cut and remove existing shoulder pavement. <br />B. Mill all existing pavement including shOUlder pavement. <br />C. Apply leveling Course as needed to existing shoulders niter milling to <br />match proposed pavement cross -slope and section. <br />D. Change base course in pavement widening from 14" Coquina Base (or <br />Optional Base Group 14) to 7 112" Coquina Base (or Optional Base <br />Group 5). <br />