My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-338A
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-338A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2024 1:27:00 PM
Creation date
2/6/2024 1:13:02 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
12/21/1999
Control Number
1999-338A
Entity Name
Summit Construction Managerment Inc.
Subject
Addendum 1 Round Island Park
Project Number
9622
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
410 <br />i <br />M <br />pERMIT`C'E'E: Indian River County <br />PERMIT NUMBER: IR -546 <br />PAGE 4 <br />SPECIAL PERMIT CONDfrIONS: <br />1, No work shall be conducted under this permit until the permittee has received a written <br />notice to proceed from the Department. <br />. Prior to issuance of the notice to proceed, the permittee shall submit two copies of <br />detailed final construction pians and specifications for all authorized structures or <br />� excavation, including all appurtenant structures and utilities. These <br />doc), ments who must shall be <br />be <br />signed and sealed by the design engineer or architect (as approp specified in Mule <br />registered in the State of Florida, and shall hear the certifications spec <br />plans <br />62B -33.007(3)(b) and 62B -33.007(3)(n), Florida Administrative Code. These <br />and specifications shall be subject to approval from the staff of the Bureau of Beaches <br />and Coastal Systems, and shall include or reflect the following: <br />2, ]�. The proposed concrete sidewalk at the seaward side of the vehicular use area <br />and surrounding the playground area shall be eliminated from the plan, and <br />replaced with interlocking paver -blocks. As an alternative. the structures may <br />be located landward to extend a maximum of 217 feet seaward of the control <br />line. <br />2,2. Quantities of earthwork cut and fill shall be indicated. <br />2.3. The asphalt driving surface and base shall be eliminated from the plan and <br />replaced with a shell driving surface. <br />2.4. 771e pavilion slab flooring shall be saw -cut or constructed in 5 -foot squares <br />(maximum). <br />2.5. ?lie seaward pavilion .shall be relocated landward to extend a maximum distance <br />of 230feet seaward of the corurol line. <br />2.6. The landward deck around the lifeguard tower shall beddeleted e. 7he propose <br />the <br />remaining decks shall be reduced to a maximum of f be <br />ramp shall be eliminated, and the proposed cross -bracing shall be modified to <br />provide a Minimum of 3 feet of clearance on the seaward side of the structure. <br />The structure shall be located as far landward as practicable, without damage <br />to dune vegetation. <br />3. Prior to the start of construction, a preconstruction conference shall be held at the site <br />among the contractor, the owner or authorized agent, and a staff representative of the <br />Bureau of Beaches and Coastal Systems to establish an understanding among the parties <br />ns <br />as to t� items <br />lice structures in the Psltall teial sta stakedard outfor tl3eiconfem the <br />permit. The <br />propos <br />
The URL can be used to link to this page
Your browser does not support the video tag.