40 <br />cunfiguratton, and the chmensrulied relattoiaslYtp of 111v installed pilings to Hie control line. This certification <br />s1Ya11 also specify tilt actual pile tip and pile )lead elevations and any grade bezint or cap elevations. Any <br />deviation front the foundation location and elevations as permitted shall be clearly noted and described in detail <br />as part o:` the certification. Construction shall stop and the cetltfication shall be subinitied and accepted prior <br />to proceeding with further vertical construction for each and every phase of a multiphase project where <br />construction above the foundation of one or more structures occurs prior to completion of all foundation work. <br />f The Bureau shall notify the permittee of approval or rejection of the certification within seven (7) working days <br />I after staff receipt of the certification. All survey information upon which the certification is based shall be <br />made available to the Bureau upon request. Permits for repairs or additions to existing structures with <br />nonconforn1111- foundations are exempt from this condition. <br />(s) For ntaior structures the perillittee shall provide the department with a sinal report certified by an <br />engineer or architect registered in the State of Florida within thirty (30) days following completion of the work. <br />This certiticatiott shall state that; all locations and elevations specified by the permit have been verified; that <br />1 <br />-all major structures are specifically constructers in accordance with Section 62B -33,007(3)(b), Florida <br />Administrative Code; other construction and activities authorized by the permit have been performed in <br />compliance with the plans and project description approved as a )tart of the permit, and all conditions of the <br />permit; or shall describe ail), deviations from the approved plans, project description or permit conditions and <br />any work not performed. Sucfi certification shall not relieve the permittee of the provisions of (l)(a) above. <br />If none of the permitted work is performed. Ilia pernliftee shall inform the Department in ­riliatg no later than <br />y 30 days following expiration of the permit. 3 -lie final certification shall be on the form "f=inal Certification" <br />DNR Form 73-115B (Revised 1.55), or on the form entitled "Final Certificatioot for Emergency Work" - DNR <br />Form 73-116 (Revised 1-85). <br />(2) The perminee shall not commence any excavation, construction or other physical activity on, or <br />encroaching on, the sovereignty land of Florida seaward of the mean high-water line, or, if established, the <br />erosion control line, until the perinittee. has received froin the Board of Trustees of the Internal improvement <br />Trust Fund the required lease, license, easement, or other form of consent authorizing the proposed use. <br />(3) The permittee shall obtain any applicable licenses or permits which may be required by Federal, <br />ate, county or municipal law. <br />General: C'opYes of any fornis referenced above may be obtained by writing, to the Departincrit of <br />Environmental Protection. BUreati of Beaches and Coastal Systems, 3900 Commonwealth Boulevard, Mail <br />Station 310. Tallahassee. Florida 32399. or bN telephoning (850)487-447.5r <br />