My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-338A
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-338A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2024 1:27:00 PM
Creation date
2/6/2024 1:13:02 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
12/21/1999
Control Number
1999-338A
Entity Name
Summit Construction Managerment Inc.
Subject
Addendum 1 Round Island Park
Project Number
9622
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 <br />i- <br />C' £S BMP 1.05 <br />C <br />#, STRAW SALE BARRIER <br />pefinition <br />A temporary sediment barrier consisting of a raw of entrenched and <br />anchored straw bales. <br />Pur Poses <br />1, To intercept and detain small amounts Of sediment from disturbed <br />areas of limited extent in order to prevent sediment from leaving the <br />site. <br />2. To decrease the velocity of sheet flows and low -to -moderate level <br />channel flows. <br />Conditions Where 'Practice Applies <br />1. Below disturbed areas subject to sheet and rill erosion. <br />2. Where the sire of the drainage area is no greater than lla acre per <br />100 feet of barrier length; the maximum slope length behind the <br />barrier is 100 feet; and the maximum slope gradient behind the <br />barrier is 50 percent (2:1). <br />1. <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.