My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-338A
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-338A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2024 1:27:00 PM
Creation date
2/6/2024 1:13:02 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
12/21/1999
Control Number
1999-338A
Entity Name
Summit Construction Managerment Inc.
Subject
Addendum 1 Round Island Park
Project Number
9622
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C> <br />1 <br />11,4. Bids by partnerships must be executed in the partnership name and signed <br />by a partner, whose title must appear under the signature and the official <br />address of the partnership must be shown below the signature. <br />1 11.5. All names must be typed or printed below the signature. <br />11.6, The Bid shall contain an acknowledgment of receipt of all Addenda. (the <br />numbers of which shall be filled in on the Bid f=orm). <br />11.7. The address to which COMMunications regarding the Bid are to be directed <br />must be shown. <br />11.$. All supporting information requested in the Bid Form must be furnished. Do <br />not leave any questions or requests unanswered. <br />12. <br />12.1. Bids shall be submitted at the time and place indicated in the Invitation to Bid <br />and shall be included in an opaque sealed envelope, marked with the <br />Project title and name and address of the Bidder and accompanied by a <br />completed Sworn Statement under the Florida Trench Safety Act, Statement <br />on Public 'Entity Crimes, the Bid Security and other required documents <br />�. which are included in the Contract Document. If the Bid is sent through the <br />mail or other delivery system, the sealed envelope shall be enclosed in a <br />separate envelope with the notation "Bid Enclosed" on the face thereof. <br />12.2. The successful Bidder will be responsible for compliance with all applicable <br />safety-related Federal and State statutes and regulations, including, but not <br />limited to, the ©SHA excavation safety standards,. 20 C.F.R., Part 1026, <br />Subpart P -Excavations, Trenching and Shoring, which are adopted by <br />reference of the newly -enacted Florida "Trench Safety Act", Section 553.60 <br />et. Seq.,Io i tu, tes, The Bidder who will perform trench excavation <br />work on a construction project with trench excavation(s) over 5 feet in depth <br />must allocate and include in its .bid the cost of compliance with trench safety <br />standards and any special shoring requirement. The Bidder Must indicate <br />in the sworn statement the method(s) he intends to use to achieve <br />compliance with each item (i.e., trench box, sheet piling, cribbing, wood <br />shoring, or other method selected by Bidder). <br />13. Modification and Withdrawal Qf Bids <br />13.1. Bids may be modified or withdrawn by an appropriate document duly <br />executed (in the manner that a Bid must be executed) and delivered to the <br />place where Bids are to be submitted at any time prior to the opening of <br />Bids. <br />I <br />I <br />INSTRUCTIONS TO BIDDERS <br />18.5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.