Laserfiche WebLink
• <br />Excavate the trench. 2. Place and stake Styrax bales. <br />pale rf <br />Flow width <br />;3,;is <br />i <br />3. fledge loose straw between <br />bales. <br />nr r° <br />4. Backfill and conpa.t the <br />excavated soil. <br />CONSoPUCTION OF A STRAW 3ALE BARRIER <br />Source. Adapted from installation Of Straw and Fabric <br />Filter Barriers for Sediment Control, <br />Sherwood and Wyant <br />Plate 1.05c <br />Points A Should be higher than point p <br />PROPER PLACEMENT OF STRAW BALE BARRIER IH DRAINAGE 'WAY <br />urce. instaiiation o' Straw anc Faoric Filter Barriers Plate 1. <br />for Secimen, Centro,, Snerw000 ane Wyant <br />6- 313 <br />