Laserfiche WebLink
4D <br />• <br />Sent By: IRC cormUn±ty Dev Dept; 561 P78 I®08; rttry 29 99 5: <br />r <br />0115 <br />Park Benches <br />14 <br />ea. <br />31 5, <br />�,, So.a <br />Trash Receptacles <br />7 <br />ea. <br />5 Si', <br />1&,q 9 �-" <br />Showeriower <br />2 <br />ea <br />1.1(00-0 -1,1 tc>. <br />Precast Bollards . Concrete <br />a <br />ea. <br />5 (,z,os, <br />4 A [o.o <br />Concrete Picnic Tables <br />ld <br />ea. <br />-I 1.0 <br />'-? 50c). 0t) <br />Bike Rack <br />t <br />ea. <br />31 5.vU <br />3"1 S.o <br />Catamarsln Launch Renovation <br />578 <br />sq. ft, <br />t3—o"., <br />2d 8 .00 <br />Ju04otaI R4.'t t �� <br />lYC <br />Picnic shelters <br />5 each <br />1-5,46on4 �� c74d0 <br />Restroom Facility <br />t each <br />-15,6-01- -1 S,000.01t <br />Lifeguard Tower <br />9 each <br />?q,4 a.a ?-30000-W) <br />Histodcal Exhibit S ria e <br />1 lump sum <br />I, 300.ov 1,3oc�k <br />-round Object"' placement <br />15 each <br />1 oa,.o 1, SOO.00 <br />au kWi tel ra. l i .. a� ••,,....� <br />Payment and Performance Bonds�Zdl <br />TOTAL BID AMOUNT: <br />(price ircfudes all work as indicated on drawings and as specked) <br />Additive Atternato ill: <br />Net Cost increase Additive Alternate 91: <br />ADDENDUM NO. 3 <br />BID PROPOSAL <br />BP•6 <br />