My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-338A
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-338A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2024 1:27:00 PM
Creation date
2/6/2024 1:13:02 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
12/21/1999
Control Number
1999-338A
Entity Name
Summit Construction Managerment Inc.
Subject
Addendum 1 Round Island Park
Project Number
9622
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />The determination of the appropriate method(s) of compliance is the complete and sole <br />responsibility of the BIDDER. Such methods will not be checked by the OWNER or <br />ENGINEER for accuracy, completeness or any other propose. The OWNER and ENGINEER <br />shall have no responsibility to review or check the BIDDER'S compliance with the Trench <br />(. Safety Standards. <br />I T. The BIDDER has allocated and included in its bid the total amount of based on <br />the square feet of shoring to be used for compliance with shoring safety requirements and <br />intends to comply with said shoring requirements by instituting the following specific <br />method(s) of compliance on this Project: <br />The determination of the appropriate method(s) of compliance is the complete and sole <br />responsibility of the Excavation Contractor. Such methods will not be checked by the <br />OWNER or ENGINEER for accuracy, completeness or any other purpose. The OWNER and <br />l ENGINEER shall have not responsibility to review or check the BIDDER'S compliance with <br />the Trench Safety Standards. <br />8. The BIDDER, in submitting this bid, represents that it has obtained and considered all <br />available geotechnical infomnation, has utilized said geotechnical information and that, based <br />on such information and the BIDDER'S own information, the BIDDER has sufficient <br />knowledge of the Projects surface and subsurface site conditions and characteristics to <br />assure BIDDER'S compliance with the applicable Trench Safety Standards in designing the <br />trench safety system(s) for the Project. <br />BIDDER <br />By U� <br />(Pond m of roe) <br />(Dates] ' <br />lk <br />SWORN TO AND SUBSCRISED before me thisl„( day of �o' L; 999. <br />[ Commission Expires; "'•SANELrfOSlCi <br />]WY COMMIS <br />t GC 859tS6 <br />C �+' EXP�I�ES:JWy2B,2a{13 <br />Nfl sy Public wrrwrunda�m.n <br />TRENC71 STATEMENT <br />T-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.