Laserfiche WebLink
• <br />E' ] <br />Park Benches <br />10 ea, <br />each <br />Trash Receptacles <br />7 ea. <br />each <br />Shower Tower <br />2 ea. <br />each <br />Precast Bollards - Concrete <br />g ea. <br />lump sum <br />Concrete Picnic Tables <br />10 ea. <br />each <br />Bike Rack <br />1 ea. <br />Catamaran Launch Renovation <br />576 sq, ft, <br />Subtotal 19: <br />Item 45 Structures <br />Picnic shelters <br />5 <br />each <br />Restroom Facility <br />1 <br />each <br />Lifeguard Tower _ <br />1 <br />each <br />Historical Exhibit Signage <br />1 <br />lump sum <br />"Found Object" placement <br />15 <br />each <br />Subtotal #5: <br />Payment and Performance Bonds <br />TOTAL 131D AMOUNT: <br />(prreo includes aU work as indicated on drawings and as specified) <br />Additive Alternate #1: <br />Change Catamaran Launch decking to 2 x 6 "Trex" Decking <br />576 <br />sq. ft. <br />Add 2" x 8" x 1d' joists 2.511Ic.f. <br />12 <br />each <br />Delete 2 x 6 pt wood decking <br />576 <br />sq.ft. <br />Net Cost increase Additive Alternate #1: <br />ADDENDUM NO. 3 <br />BID PROPOSAL <br />BP -6 <br />